BDx CGK5, Suryacipta City of Industry data center

Karawang, West Java, Indonesia · Greater Jakarta market · location approximate to district level

BDx CGK5, Suryacipta City of Industry is a data center project in Karawang, Indonesia, operated by BDx Indonesia. It is under construction. It is planned for 100 MW of IT load.

Record last checked against its sources on 22 October 2026.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
100 MW
Running now
0 MW
Operators rarely publish this
Operator
BDx Indonesia
Joint venture
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Leaning yes5 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed○ Tenant or own use○ Builder appointed✓ Construction started

Next gate to watch: Tenant or own use.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Indonesia approves, powers and taxes data centers is on Data center rules in Indonesia.

Where it sits

Greater Jakarta holds 37 active projects with 3,240 MW of planned IT load between them, and BDx CGK5, Suryacipta City of Industry ranks 11th by planned capacity. Of those, 12 are operational, 10 are operational and expanding, 8 are under construction, 1 is being commissioned, 1 is at the land and permitting stage, 3 are announced only and 2 are on hold. Published colocation vacancy in Greater Jakarta was 24.9% as of December 2025, on 322 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

BDx has 2 others in Indonesia tracked by ArusGrid, including BDx CGK4 AI Campus, Jatiluhur and BDx CGK3A, Cilandak. It sits on the BDx CGK5 Suryacipta campus. Named funding comes from I Squared Capital on the equity side and Indosat Ooredoo Hutchison and Lintasarta. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

Power comes from PLN through grid supply (reported, unconfirmed). Cooling uses direct liquid cooling.

Grid power for a large industrial user in Indonesia costs about US$0.062 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Indonesia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 6 public sources for this project, the latest dated 9 September 2026, and last checked the record on 22 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Part of BDx's 'national AI infrastructure platform' with PLN; greenfield hyperscale build with 385 MVA grid allocation secured Jun 2026.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Who is behind it

OperatorBDx Indonesia · Joint venture
Funder, EquityI Squared Capital
Funder, Joint venture partnerIndosat Ooredoo Hutchison
Funder, Joint venture partnerLintasarta

Who uses the compute

Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

ArusGrid estimate, building costabout US$953m to US$1.4bn

No figure has been announced. This range is 100 MW of planned IT load times a published benchmark of US$11.21 per watt for Jakarta, plus or minus 15 percent, with 10 percent more at the top for liquid cooling because the project is AI-positioned. It covers the building and its mechanical and electrical plant. It excludes land, grid works, servers and fees.

Benchmark: Turner & Townsend Data Centre Construction Cost Index 2025, as reported by Data Storage Asia. An estimate is never added to any total on the site.

Platform deals that include it

BDx and PLN 1.2 GW national power commitment
Power deal, 2026-06
Not disclosed
BDx Indonesia US$320m loan (Permata, BCA, KB Bank)
Debt, 2026-04-01
US$320m

Platform capital spans several sites. It is never added to this project's own figure.

Colocation price per kW of IT load per month

No published price band exists for Indonesia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Land
Industrial estateSuryacipta City of Industry (PT Suryacipta Swadaya, Surya Semesta Internusa) · 12 acres · Nov 2022 Reported source ↗
Purchase or lease terms not disclosed.
Industrial estatePT Suryacipta Swadaya (Suryainternusa Group) · 12 acres · Nov 2022 Reported source ↗
12 acres in Suryacipta City of Industry, Karawang. Transaction type not stated.
Power supply
Grid supplyPLN · 385 MVA · Jun 2026 Reported source ↗
385 MVA network development for CGK5 Suryacipta, part of BDx 1.2 GW commitment
Grid supplyPT PLN (Persero) · 385 MVA · Jun 2026 Reported source ↗
Up to 385 MVA for CGK5 Suryacipta under power supply agreements totalling 1.2GW across BDx sites. · Applies to the whole campus.
Water and cooling
CoolingDirect liquid cooling Confirmed source ↗
BDx's CGK5 page lists liquid cooling among AI and high-density features.

Sources checked 2026-10-22

  1. bdxworld.com
  2. bdxworld.com
  3. bdxworld.com
  4. BDx Data Centers signs 1.2GW of power supply agreements with Indonesian utility PLN (DatacenterDynamics, 2026-06-03)
  5. CGK5 | BDx Data Centers (BDx Data Centers, 2026-09-09)
  6. BDx Secures US$320 Million Loan to Accelerate AI-Ready Data Center Infrastructure in Asia (BDx Data Centers (PR Newswire), 2026-04-01)

More in Greater Jakarta

Also run by BDx

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.