ArusGridProject
Directory › Indonesia › Greater Jakarta › STT Jakarta 5

STT Jakarta 5 data center

Cikarang, Bekasi, West Java, Indonesia · Greater Jakarta market · location approximate to district level

STT Jakarta 5 is a data center project in Cikarang, Bekasi, Indonesia, operated by STT GDC Indonesia. It is under construction. It is planned for 40 MW of IT load.

Latest change on record: entered the record as under construction on 10 June 2026. Record last checked against its sources on 22 October 2026.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
40 MW
Running now
0 MW
Operators rarely publish this
Operator
STT GDC Indonesia
Joint venture
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Leaning yes5 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed○ Tenant or own use○ Builder appointed✓ Construction started

Next gate to watch: Tenant or own use.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Indonesia approves, powers and taxes data centers is on Data center rules in Indonesia.

Where it sits

Greater Jakarta holds 37 active projects with 3,240 MW of planned IT load between them, and STT Jakarta 5 ranks 17th by planned capacity. Of those, 12 are operational, 10 are operational and expanding, 8 are under construction, 1 is being commissioned, 1 is at the land and permitting stage, 3 are announced only and 2 are on hold. Published colocation vacancy in Greater Jakarta was 24.9% as of December 2025, on 322 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

STT GDC has 6 others in Indonesia and 18 projects elsewhere in the dataset tracked by ArusGrid, including STT Jakarta 7 to 9 (future phases), STT Jakarta 4 and STT Jakarta 6. It sits on the STT Jakarta Campus (GIIC) alongside STT Jakarta 1, STT Jakarta 2, STT Jakarta 3 and STT Jakarta 4. Named funding comes from KKR and Singtel on the equity side and Triputra Group. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The stage was recorded as under construction on 10 June 2026.

Grid power for a large industrial user in Indonesia costs about US$0.062 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Indonesia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 6 public sources for this project, the latest dated 1 September 2026, and last checked the record on 22 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Campus engineered for Nvidia Vera Rubin / Vera Rubin Ultra GPU systems (Jun 2026 PR).

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

Full build · Under construction40 MW, target 2027

Stage history

2026-06-10Under construction · idnfinancials.com

Who is behind it

OperatorSTT GDC Indonesia · Joint venture
Funder, Joint venture partnerTriputra Group
Funder, EquityKKR
Funder, EquitySingtel

Who uses the compute

Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

ArusGrid estimate, building costabout US$381m to US$567m

No figure has been announced. This range is 40 MW of planned IT load times a published benchmark of US$11.21 per watt for Jakarta, plus or minus 15 percent, with 10 percent more at the top for liquid cooling because the project is AI-positioned. It covers the building and its mechanical and electrical plant. It excludes land, grid works, servers and fees.

Benchmark: Turner & Townsend Data Centre Construction Cost Index 2025, as reported by Data Storage Asia. An estimate is never added to any total on the site.

Platform deals that include it

KKR + Singtel acquisition of STT GDC (platform M&A)
Platform acquisition, 2026-09-01
US$5.1bn
STT GDC Indonesia IDR 8.8tn (~US$500M) dual-currency facility
Debt, 2026-06
US$500m

Platform capital spans several sites. It is never added to this project's own figure.

Colocation price per kW of IT load per month

No published price band exists for Indonesia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Land
Industrial estateGreenland International Industrial Center (GIIC), Kota Deltamas · Jun 2026 Reported source ↗
STT Jakarta campus (9 DCs, ~360MW) located in GIIC Cikarang; plot terms not disclosed
Power supply
Dedicated substationJun 2026 Reported source ↗
On-site high-voltage substation for the Bekasi campus expansion. No kV or MVA given. · Applies to the whole campus.

Sources checked 2026-10-22

  1. sttelemediagdc.com
  2. datacenterdynamics.com
  3. STT GDC Accelerates Jakarta Campus Expansion to Power Indonesia's AI and Digital Ambitions (STT GDC, 2026-06-10)
  4. KKR-Singtel Consortium Completes Acquisition of STTGDC; Company Launches Refreshed Global Brand for Next Phase of Growth (STT GDC via Access Newswire, 2026-09-01)
  5. STT GDC Indonesia accelerates expansion with four new data centres (IDN Financials, 2026-06-10)
  6. STT GDC gets cracking on next two data centres after launching STT Jakarta 2 (Developing Telecoms, 2026-06-12)

Same campus, STT Jakarta Campus (GIIC)

More in Greater Jakarta

Also run by STT GDC

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.