Directory › Indonesia › Greater Jakarta › SMX01 (SM+ / LG Sinar Mas), Jakarta CBD

SMX01 (SM+ / LG Sinar Mas), Jakarta CBD data center

Jakarta, DKI Jakarta, Indonesia · Greater Jakarta market · location approximate to city level

SMX01 (SM+ / LG Sinar Mas), Jakarta CBD is a data center project in Jakarta, Indonesia, operated by SM+ (SMPlus Digital Investment) / LG Sinar Mas. It is under construction. It is planned for 27 MW of IT load.

Latest change on record: entered the record as under construction on 6 March 2025. Record last checked against its sources on 21 October 2026.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
27 MW
Running now
0 MW
Operators rarely publish this
Operator
SM+ (SMPlus Digital Investment) / LG Sinar Mas
Joint venture
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Strong6 of 7 gates passed
✓ Land secured○ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

Next gate to watch: Power arranged.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Indonesia approves, powers and taxes data centers is on Data center rules in Indonesia.

Where it sits

Greater Jakarta holds 37 active projects with 3,240 MW of planned IT load between them, and SMX01 (SM+ / LG Sinar Mas), Jakarta CBD ranks 22th by planned capacity. Of those, 12 are operational, 10 are operational and expanding, 8 are under construction, 1 is being commissioned, 1 is at the land and permitting stage, 3 are announced only and 2 are on hold. Published colocation vacancy in Greater Jakarta was 24.9% as of December 2025, on 322 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

It is the only Sinar Mas project ArusGrid tracks. Named funding comes from Sinar Mas and LG (Korean partner). The named user of the compute is Konst (confirmed).

The build is phased. Phase 1 at 6 MW is under construction with a 2026 target; Phase 2 at 20 MW is announced. The stage was recorded as under construction on 6 March 2025. The money on record is IDR 4.9tn (about US$300m) as of March 2025, the announced investment.

Grid power for a large industrial user in Indonesia costs about US$0.062 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Indonesia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 6 public sources for this project, the latest dated 10 August 2026, and last checked the record on 21 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderYes
Disclosed client (confirmed)Yes
Committed or approved capitalYes
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Operator says the facility is optimized for AI and high-density workloads with liquid cooling.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

Phase 1 · Under construction6 MW, target 2026
Phase 2 · Announced20 MW

Stage history

2025-03-06Under construction · jakartaglobe.id

Who is behind it

OperatorSM+ (SMPlus Digital Investment) / LG Sinar Mas · Joint venture
Funder, Joint venture partnerSinar Mas
Funder, Joint venture partnerLG (Korean partner)

Who uses the compute

Tenant · GPU cloudKonst · confirmed

GPU deployment at SMX01, capacity undisclosed; SMX01 phase 1 is 6MW of 27MW · as of 2026-08-10

DCD reports Konst, a Taiwanese cloud provider, signed a data center lease with LG Sinar Mas for SMX01 and will deploy GPU infrastructure there with Giga Computing servers and Raydian Cloud operations. Konst's own release of 6 Aug 2026, 'KONST Signs Data Center Collaboration Agreement with SM+ Data Centers and LG Sinar Mas for SMX01, Expanding Its Compute Footprint into Southeast Asia' (EIN Presswire), was seen in Google News results; its URL could not be resolved from this shell.

Source · Taiwanese cloud provider Konst signs data center lease with LG Sinar Mas in Indonesia (DCD, 2026-08-10)

Money at this site

Announced investment, 2025-03IDR 4.9tn (about US$300m)

Colocation price per kW of IT load per month

No published price band exists for Indonesia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Project team
Mechanical and electrical worksPT LG Sinar Mas Technology Solutions · Rp1.23m (≈US$75m) · Aug 2025 Confirmed source ↗
MEP systems, long-lead equipment, ICT, security systems, integrated management and control systems
Water and cooling
Cooling Reported source ↗
Liquid cooling per SM+'s earlier announcement. The type of liquid cooling is not stated.

Sources checked 2026-10-21

  1. datacenterdynamics.com
  2. thejakartapost.com
  3. Taiwanese cloud provider Konst signs data center lease with LG Sinar Mas in Indonesia (DatacenterDynamics, 2026-08-10)
  4. Indonesia's Dian Swastatika Taps LG Joint Venture for $75 Million Data Center Contract (Jakarta Globe, 2025-08-05)
  5. SM+ Data Centers, KIRA and LG Sinar Mas top out SMX01 in Jakarta (W.Media, 2026-05-11)
  6. DSSA and Korean investor to build data centre on bought land from BSDE (IDNFinancials)

More in Greater Jakarta

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.