ArusGridProject
Directory › Indonesia › Greater Jakarta › Aslan Jakarta Data Centre (AJDC), JIEP Pulogadung

Aslan Jakarta Data Centre (AJDC), JIEP Pulogadung

East Jakarta (Jakarta Industrial Estate Pulogadung), DKI Jakarta, Indonesia · Greater Jakarta market · location approximate to district level

Aslan Jakarta Data Centre (AJDC), JIEP Pulogadung is a data center project in East Jakarta (Jakarta Industrial Estate Pulogadung), Indonesia, operated by Aslan Energy Capital. It has been announced and has not yet reached the land or permitting stage. It is planned for 40 MW of IT load.

Latest change on record: entered the record as announced on 16 June 2025. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Announced
Planned IT load
40 MW
Running now
Not disclosed
Operators rarely publish this
Operator
Aslan Energy Capital
Local developer
AI workloads
No signal either way
Evidence grade
Sourced
Will it get built?Open question2 of 7 gates passed
✓ Land secured○ Power arranged○ Approvals granted✓ Money committed○ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Power arranged.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Indonesia approves, powers and taxes data centers is on Data center rules in Indonesia.

Where it sits

Greater Jakarta holds 37 active projects with 3,240 MW of planned IT load between them, and Aslan Jakarta Data Centre (AJDC), JIEP Pulogadung ranks 16th by planned capacity. Of those, 12 are operational, 10 are operational and expanding, 8 are under construction, 1 is being commissioned, 1 is at the land and permitting stage, 3 are announced only and 2 are on hold. Published colocation vacancy in Greater Jakarta was 24.9% as of December 2025, on 322 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

It is the only Aslan Energy Capital project ArusGrid tracks. Named funding comes from Aslan Energy Capital on the equity side and Jakarta Industrial Estate Pulogadung (JIEP). No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The stage was recorded as announced only on 16 June 2025. Cooling uses air cooling.

Grid power for a large industrial user in Indonesia costs about US$0.062 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Indonesia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 4 public sources for this project, the latest dated 24 June 2025, and last checked the record on 19 October 2026.

How well evidenced is it

One or two hard signals sit behind the announcement. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusNo signal either way

No public signal either way.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

Phase 1 · Land and permittingSize not published, target 2027

Stage history

2025-06-16Announced · intelligentcio.com

Who is behind it

OperatorAslan Energy Capital · Local developer
Funder, EquityAslan Energy Capital
Funder, Joint venture partnerJakarta Industrial Estate Pulogadung (JIEP)

Who uses the compute

Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

ArusGrid estimate, building costabout US$381m to US$516m

No figure has been announced. This range is 40 MW of planned IT load times a published benchmark of US$11.21 per watt for Jakarta, plus or minus 15 percent. It covers the building and its mechanical and electrical plant. It excludes land, grid works, servers and fees.

Benchmark: Turner & Townsend Data Centre Construction Cost Index 2025, as reported by Data Storage Asia. An estimate is never added to any total on the site.

Colocation price per kW of IT load per month

No published price band exists for Indonesia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Land
Industrial estatePT Jakarta Industrial Estate Pulogadung (JIEP) · 40,000 sqm · Jun 2025 Reported source ↗
Binding heads of agreement with JIEP. About 40 percent of the site is built on, the rest green buffer.
Power supply
Power allocation or planJun 2025 Reported source ↗
Primarily renewable · Mainly renewable power with a 120MW battery storage system. Purchase route not stated.
Water and cooling
CoolingAir cooled Reported source ↗
Hybrid air-cooled heat exchangers with no cooling towers.

Sources checked 2026-10-19

  1. prnewswire.com
  2. datacenterdynamics.com
  3. Aslan Energy and JIEP to build 40MW data center in Jakarta (W.Media, 2025-06-24)
  4. Aslan Energy Capital and JIEP to develop East Jakarta's renewable-powered hyperscale data centre (Intelligent CIO APAC, 2025-06-16)

More in Greater Jakarta

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.