ArusGridProject
Directory › Indonesia › Greater Jakarta › Digital Realty Bersama CGK11, Central Jakarta

Digital Realty Bersama CGK11, Central Jakarta data center

Jakarta, DKI Jakarta, Indonesia · Greater Jakarta market · location approximate to city level

Digital Realty Bersama CGK11, Central Jakarta is a data center project in Jakarta, Indonesia, operated by Digital Realty Bersama (BDDC). It is operational and expanding. It is planned for 32 MW of IT load. The operator reports 5 MW running.

Record last checked against its sources on 22 October 2026.

Open on the mapSuggest a correction
Stage
Expanding
Planned IT load
32 MW
Running now
5 MW
Operators rarely publish this
Operator
Digital Realty Bersama (BDDC)
Joint venture
AI workloads
No signal either way
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Indonesia approves, powers and taxes data centers is on Data center rules in Indonesia.

Where it sits

Greater Jakarta holds 37 active projects with 3,240 MW of planned IT load between them, and Digital Realty Bersama CGK11, Central Jakarta ranks 19th by planned capacity. Of those, 12 are operational, 10 are operational and expanding, 8 are under construction, 1 is being commissioned, 1 is at the land and permitting stage, 3 are announced only and 2 are on hold. Published colocation vacancy in Greater Jakarta was 24.9% as of December 2025, on 322 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

Digital Realty has 1 other in Indonesia and 4 projects elsewhere in the dataset tracked by ArusGrid, including Digital Realty Bersama CGK10, West Jakarta (ex-SpaceDC JAK2, ex-AtriaDC). It sits on the Digital Realty Bersama Jakarta campus. Named funding comes from Digital Realty and Bersama Digital Infrastructure Asia. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The build is phased. Phase 1 at 5 MW is operational with a 2024 target; Full build at 32 MW is announced. Power comes from PLN through a green tariff (reported, unconfirmed). Cooling uses air cooling.

Grid power for a large industrial user in Indonesia costs about US$0.062 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Indonesia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 7 public sources for this project, the latest dated 22 April 2026, and last checked the record on 22 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusNo signal either way

No public signal either way.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

Phase 1 · Operational5 MW, target 2024
Full build · Announced32 MW

Who is behind it

OperatorDigital Realty Bersama (BDDC) · Joint venture
Funder, Joint venture partnerDigital Realty
Funder, Joint venture partnerBersama Digital Infrastructure Asia

Who uses the compute

Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

ArusGrid estimate, building costabout US$305m to US$413m

No figure has been announced. This range is 32 MW of planned IT load times a published benchmark of US$11.21 per watt for Jakarta, plus or minus 15 percent. It covers the building and its mechanical and electrical plant. It excludes land, grid works, servers and fees.

Benchmark: Turner & Townsend Data Centre Construction Cost Index 2025, as reported by Data Storage Asia. An estimate is never added to any total on the site.

Platform deals that include it

Digital Realty / Bersama Digital 50-50 Indonesia JV
Platform acquisition, 2025-03
US$100m

Platform capital spans several sites. It is never added to this project's own figure.

Colocation price per kW of IT load per month

No published price band exists for Indonesia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Power supply
Green tariffPLN · Apr 2026 Reported source ↗
DRB says it partnered with PLN and holds a Renewable Energy Certificate (REC) for the site's electricity. · No supply capacity given.
Water and cooling
CoolingAir cooled Reported source ↗
Bisnis reports CGK11 uses conventional air conditioning today. DRB plans an AI-ready upgrade in about four months that adds in-rack liquid cooling to chip level for 20 to 100kW per rack.

Sources checked 2026-10-22

  1. datacenterdynamics.com
  2. bd-dc.com
  3. datacentermap.com
  4. Digital Realty Bersama siap ekspansi in-town data centre 27 MW di 2026 (IDNFinancials, 2026-04-22)
  5. Digital Realty Bersama akan Ekspansi, Sediakan Pusat Data Berkapasitas 63 MW (Katadata, 2026-04-22)
  6. Industri Data Center RI Tumbuh Pesat, Didorong Lonjakan Kebutuhan AI (Infobanknews, 2026-04-22)
  7. Digital Realty Bersama Proyeksi Kebutuhan Data Center AI di RI Naik Dua Kali Lipat (Bisnis.com, 2026-04-22)

More in Greater Jakarta

Also run by Digital Realty

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.