Digital Loyang II (SIN12) is a data center project in Singapore, operated by Digital Realty. It is operational. It is planned for 50 MW of IT load.
Latest change on record: entered the record as operational on 6 April 2021. Record last checked against its sources on 20 October 2026.
This project is built or running, so every gate counts as passed.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How Singapore approves, powers and taxes data centers is on Data center rules in Singapore.
Singapore holds 39 active projects with 874 MW of planned IT load between them, and Digital Loyang II (SIN12) ranks 5th by planned capacity. Of those, 27 are operational, 3 are operational and expanding, 3 are under construction, 1 is past financial close and 5 are announced only. Published colocation vacancy in Singapore was 4.9% as of December 2025, on 1,043 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.
Digital Realty has 3 others in Singapore and 2 projects elsewhere in the dataset tracked by ArusGrid, including Digital Realty Jurong Island (DC-CFA2), Digital Jurong (SIN10) and Digital Loyang I (SIN11). It sits on the Digital Loyang Connected Campus alongside Digital Loyang I (SIN11). Named users of the compute are Major Singaporean bank and Leading global cloud provider (reported, unconfirmed).
The stage was recorded as operational on 6 April 2021. The money on record is US$1bn as of April 2021, the announced investment. Power comes from Tuas Power (reported, unconfirmed). Cooling uses evaporative cooling, with a design PUE of 1.25.
Grid power for a large industrial user in Singapore costs about US$0.20 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Singapore, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 6 public sources for this project, the latest dated 6 April 2021, and last checked the record on 20 October 2026.
Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.
global cloud provider pre-lease reported; PUE 1.25
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
94% of 50MW occupied at Aug 2026 · as of 2026-08-12
DCD's report on Digital Core REIT buying 2.5% of 11 Loyang Close (SIN12) states 94% occupancy and no customer names. Digital Realty's 2021 opening release described the customer base as cloud service providers and financial institutions. No document names the 'major Singaporean bank' or 'leading global cloud provider' in ArusGrid.
Source · Digital Core REIT to sell stakes in three US data centers back to Digital Realty, buys stake in two facilities in Asia (DCD, 2026-08-12)
Source · Digital Realty opens third data centre, serving cloud service providers and financial institutions (Techgoondu, 2021-04-06)
The figure covers several facilities.
Digital Realty's Singapore metro, three buildings blended: annualised rent US$276.2m on 72 MW at 93.9 percent occupancy gives about US$340 per occupied kW, while the same supplemental prices Singapore leases under 1 MW at US$327 and over 1 MW at US$135 per kW per month Electricity excluded. As of 2026-06. Digital Realty via SEC EDGAR, 2026-08-01
One disclosure for SIN10, SIN11 and SIN12 together, so no single building carries it, and the occupancy basis mixes square feet with MW. The range shown runs from the over 1 MW figure to the under 1 MW figure. Electricity excluded, utilities reimbursed separately.
All projects in Singapore · All projects in Singapore · All Digital Realty projects · All projects operational · Data center rules in Singapore · Full directory