AirTrunk SGP2 data center

Singapore, Singapore · Singapore market · location approximate to district level

Also listed as AirTrunk SGP2 data center.

AirTrunk SGP2 is a data center project in Singapore, operated by AirTrunk. It has closed its financing and construction has not been confirmed. The only published capacity figure is 70 MW of total facility power. IT load will be lower.

Latest change on record: entered the record as financing closed on 18 August 2025. Record last checked against its sources on 21 October 2026.

Open on the mapSuggest a correction
Stage
Financing closed
Planned IT load
70 MW
Total facility power
Running now
Not disclosed
Operators rarely publish this
Operator
AirTrunk
Colocation
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Open question3 of 7 gates passed
○ Land secured✓ Power arranged○ Approvals granted✓ Money committed✓ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Land secured.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Singapore approves, powers and taxes data centers is on Data center rules in Singapore.

Where it sits

Singapore holds 39 active projects with 874 MW of planned IT load between them, and AirTrunk SGP2 ranks third by planned capacity. Of those, 27 are operational, 3 are operational and expanding, 3 are under construction, 1 is past financial close and 5 are announced only. Published colocation vacancy in Singapore was 4.9% as of December 2025, on 1,043 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

AirTrunk has 1 other in Singapore and 10 projects elsewhere in the dataset tracked by ArusGrid, including AirTrunk SGP1. It sits on the AirTrunk Loyang campus alongside AirTrunk SGP1. Named funding comes from Blackstone and CPP Investments on the equity side and ByteDance. The named user of the compute is ByteDance (reported, unconfirmed).

The stage was recorded as past financial close on 18 August 2025. The money on record is S$2,250m (about US$1.8bn) as of August 2025, debt raised, which ArusGrid keeps out of capital totals.

Grid power for a large industrial user in Singapore costs about US$0.20 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Singapore, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 5 public sources for this project, the latest dated 31 March 2026, and last checked the record on 21 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed client (reported)Yes
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

ByteDance consortium; modern build

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

Phase 1 (DC-CFA award ~20MW) · Under construction20 MW

Stage history

2025-08-18Financing closed · airtrunk.com

Who is behind it

OperatorAirTrunk · Colocation
Funder, EquityBlackstone
Funder, EquityCPP Investments
Funder, Joint venture partnerByteDance
Funder, DebtBank syndicate (20+ banks)

Who uses the compute

Tenant · hyperscalerByteDance · reported, unconfirmed

DC-CFA consortium partner on AirTrunk's second Singapore build; occupancy share not stated · as of 2023-07-14

IMDA's press release names 'AirTrunk-ByteDance (Consortium)' as one of four DC-CFA awardees; AirTrunk's only new Singapore facility since is SGP2 (Loyang, 70MW+, S$2.2bn green loan, Forbes 20 Aug 2025). No document names ByteDance as SGP2's occupier, and Capacity (3 Apr 2025) describes the anchor only as 'a major US client', so the tenant link stays reported.

Source · 4 Proposals Selected from Data Centre Application (IMDA, 2023-07-14)

Source · Blackstone-backed AirTrunk gets $1.8 billion loan to build second data centre (Forbes Australia, 2025-08-20)

Money at this site

Debt raised, 2025-08S$2,250m (about US$1.8bn)

This is the size of a loan. ArusGrid excludes it from capital spending totals.

Platform deals that include it

Blackstone/CPP acquisition of AirTrunk
Platform acquisition, 2024-09
US$16.1bn

Platform capital spans several sites. It is never added to this project's own figure.

Colocation price per kW of IT load per month

ArusGrid estimate, grade CUSD 261 to USD 373

ArusGrid estimate, grade C. Published band for this country. Priced on the hyperscale band, which already reflects anchor deals. No usable capex for this site. Electricity excluded in the band. An estimate, never a quote, computed by fixed rules published on the Colo prices page and never counted in any total.

market band, hyperscale (2024-12)USD 261 to USD 373 datacenterHawk for NTT DC REIT, 2025-07-07
Power supply
Grid supply66kV Confirmed source ↗
Diverse 66kV feeds; design PUE 1.20
Water and cooling
Coolingdesign PUE 1.2 Confirmed source ↗
Design PUE 1.20 with a Green Mark Platinum target. Cooling type not stated.

Sources checked 2026-10-21

  1. forbes.com
  2. imda.gov.sg
  3. baxtel.com
  4. AirTrunk secures landmark S$2.25 billion green loan, advancing Singapore’s role as Asia’s green finance hub (AirTrunk, 2025-08-18)
  5. Landmark green loan for AirTrunk SGP2 data centre (Standard Chartered, 2026-03-31)

Same campus, AirTrunk Loyang

More in Singapore

Also run by AirTrunk

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.