STT GDC Jurong Island (DC-CFA2)

Jurong Island, Singapore · Singapore market · location approximate to district level

STT GDC Jurong Island (DC-CFA2) is a data center project in Jurong Island, Singapore, operated by ST Telemedia Global Data Centres. It has been announced and has not yet reached the land or permitting stage. It is planned for 50 MW of IT load.

Latest change on record: entered the record as announced on 21 August 2026. Record last checked against its sources on 21 October 2026.

Open on the mapSuggest a correction
Stage
Announced
Planned IT load
50 MW
Running now
Not disclosed
Operators rarely publish this
Operator
ST Telemedia Global Data Centres
Colocation
AI workloads
No signal either way
Evidence grade
Sourced
Will it get built?Open question2 of 7 gates passed
✓ Land secured○ Power arranged○ Approvals granted✓ Money committed○ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Power arranged.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Singapore approves, powers and taxes data centers is on Data center rules in Singapore.

Where it sits

Singapore holds 39 active projects with 874 MW of planned IT load between them, and STT GDC Jurong Island (DC-CFA2) ranks 9th by planned capacity. Of those, 27 are operational, 3 are operational and expanding, 3 are under construction, 1 is past financial close and 5 are announced only. Published colocation vacancy in Singapore was 4.9% as of December 2025, on 1,043 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

STT GDC has 2 others in Singapore and 22 projects elsewhere in the dataset tracked by ArusGrid, including STT Singapore 1 to 3 (Defu campus) and STT Singapore 6 (Loyang). It sits on the Jurong Island Data Centre Park alongside Digital Realty Jurong Island (DC-CFA2), Equinix Jurong Island (DC-CFA2) and Keppel DC SGP 11, Jurong Island (DC-CFA2). Named funding comes from KKR and Singtel on the equity side. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The stage was recorded as announced only on 21 August 2026.

Grid power for a large industrial user in Singapore costs about US$0.20 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Singapore, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 6 public sources for this project, the latest dated 1 September 2026, and last checked the record on 21 October 2026.

How well evidenced is it

One or two hard signals sit behind the announcement. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusNo signal either way

No AI tenant, workload or design disclosure. The DC-CFA2 award is gated on sustainability criteria rather than a stated AI purpose, so no inference is drawn.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Stage history

2026-08-21Announced · edb.gov.sg

Who is behind it

OperatorST Telemedia Global Data Centres · Colocation
Funder, EquityKKR
Funder, EquitySingtel

Who uses the compute

Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Platform deals that include it

KKR + Singtel acquisition of STT GDC (platform M&A)
Platform acquisition, 2026-09-01
US$5.1bn

Platform capital spans several sites. It is never added to this project's own figure.

Colocation price per kW of IT load per month

ArusGrid estimate, grade CUSD 261 to USD 373

ArusGrid estimate, grade C. Published band for this country. Priced on the hyperscale band, which already reflects anchor deals. No usable capex for this site. Electricity excluded in the band. An estimate, never a quote, computed by fixed rules published on the Colo prices page and never counted in any total.

market band, hyperscale (2024-12)USD 261 to USD 373 datacenterHawk for NTT DC REIT, 2025-07-07
Land
Allocated byJTC Corporation (Jurong Island low-carbon data centre park) · Aug 2026 Reported source ↗
Provisional 50MW allocation in a park JTC is developing on Jurong Island. Plot size and lease term not disclosed.
Power supply
Power allocation or plan50 MW · Aug 2026 Reported source ↗
Committed >50% of capacity from green energy (biomethane, low-carbon ammonia/hydrogen, BIPV/BAPV) · DC-CFA2 provisional 50MW allocation; liquid cooling, Green Mark DC Platinum required
Possibly linked
The source does not name the project, and more than one project we track fits. We show it on each of them and pin it to none.
UnconfirmedIndustrial raw water · Jurong Island utility providers (demineralised water, seawater cooling circuits) source ↗
This project is one of 4 that fit. The others are Digital Realty Jurong Island (DC-CFA2), Equinix Jurong Island (DC-CFA2), Keppel DC SGP 11, Jurong Island (DC-CFA2).

Sources checked 2026-10-21

  1. Four data centre proposals selected as part of second Data Centre Call for Application (Singapore Economic Development Board, 2026-08-21)
  2. Singapore picks four operators to boost data centre capacity by 200MW (Techgoondu, 2026-08-21)
  3. KKR-Singtel Consortium Completes Acquisition of STTGDC; Company Launches Refreshed Global Brand for Next Phase of Growth (STT GDC via Access Newswire, 2026-09-01)
  4. Singapore gov't allocates 200MW of power for four data center developers on Jurong Island (DatacenterDynamics, 2026-08-21)
  5. Singapore’s DC-CFA2 winners announced; third CFA possible (W.Media, 2026-08-21)
  6. Jurong Island to host Singapore's largest green data centre park; 10 per cent of land set aside for new energies (Singapore Economic Development Board, 2025-10-28)

Same campus, Jurong Island Data Centre Park

More in Singapore

Also run by STT GDC

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.