STT GDC Jurong Island (DC-CFA2) is a data center project in Jurong Island, Singapore, operated by ST Telemedia Global Data Centres. It has been announced and has not yet reached the land or permitting stage. It is planned for 50 MW of IT load.
Latest change on record: entered the record as announced on 21 August 2026. Record last checked against its sources on 21 October 2026.
Next gate to watch: Power arranged.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How Singapore approves, powers and taxes data centers is on Data center rules in Singapore.
Singapore holds 39 active projects with 874 MW of planned IT load between them, and STT GDC Jurong Island (DC-CFA2) ranks 9th by planned capacity. Of those, 27 are operational, 3 are operational and expanding, 3 are under construction, 1 is past financial close and 5 are announced only. Published colocation vacancy in Singapore was 4.9% as of December 2025, on 1,043 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.
STT GDC has 2 others in Singapore and 22 projects elsewhere in the dataset tracked by ArusGrid, including STT Singapore 1 to 3 (Defu campus) and STT Singapore 6 (Loyang). It sits on the Jurong Island Data Centre Park alongside Digital Realty Jurong Island (DC-CFA2), Equinix Jurong Island (DC-CFA2) and Keppel DC SGP 11, Jurong Island (DC-CFA2). Named funding comes from KKR and Singtel on the equity side. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.
The stage was recorded as announced only on 21 August 2026.
Grid power for a large industrial user in Singapore costs about US$0.20 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Singapore, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 6 public sources for this project, the latest dated 1 September 2026, and last checked the record on 21 October 2026.
One or two hard signals sit behind the announcement. The rules are fixed and published on the Methodology page.
No AI tenant, workload or design disclosure. The DC-CFA2 award is gated on sustainability criteria rather than a stated AI purpose, so no inference is drawn.
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.
Platform capital spans several sites. It is never added to this project's own figure.
ArusGrid estimate, grade C. Published band for this country. Priced on the hyperscale band, which already reflects anchor deals. No usable capex for this site. Electricity excluded in the band. An estimate, never a quote, computed by fixed rules published on the Colo prices page and never counted in any total.
All projects in Singapore · All projects in Singapore · All STT GDC projects · All projects announced only · Data center rules in Singapore · Full directory