Chennai, Tamil Nadu, India · Chennai market · location approximate to district level

STT Chennai Ambattur campus (Chennai 2, 3 and 4) is a data center project in Chennai, India, operated by STT GDC India. It is operational and expanding. It is planned for 58 MW of IT load. The operator reports 40 MW running.

Latest change on record: moved to expanding on 20 February 2026. Record last checked against its sources on 22 October 2026.

Open on the mapSuggest a correction
Stage
Expanding
Planned IT load
58 MW
Running now
40 MW
Operators rarely publish this
Operator
STT GDC India
Colocation
AI workloads
Likely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How India approves, powers and taxes data centers is on Data center rules in India.

Where it sits

Chennai holds 16 active projects with 819 MW of planned IT load between them, and STT Chennai Ambattur campus (Chennai 2, 3 and 4) ranks 5th by planned capacity. Of those, 10 are operational, 1 is operational and expanding, 2 are under construction, 2 are at the land and permitting stage and 1 is announced only. Published colocation vacancy in Chennai was 24.2% as of June 2025. Vacancy excludes hyperscaler self-build.

STT GDC has 9 others in India and 15 projects elsewhere in the dataset tracked by ArusGrid, including STT GDC Bengaluru Devanahalli campus, STT GDC Pune campus (Dighi) and STT GDC Palava campus. It sits on the STT Ambattur campus. Named funding comes from ST Telemedia on the equity side. No user of the capacity is on the public record as of 2026-10-02, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The build is phased. Chennai 2 and 3 at 40 MW is operational; Chennai 4 at 18 MW is under construction. The dated record runs from operational on 1 February 2024 to operational and expanding on 20 February 2026. Power comes from CleanMax (Clean Max Enviro Energy Solutions) through a renewable power purchase agreement.

The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 6 public sources for this project, the latest dated 4 July 2026, and last checked the record on 22 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Operator markets Chennai 4 as AI-ready; no cooling or GPU disclosure.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

Chennai 2 and 3 · Operational40 MW
Chennai 4 · Under construction18 MW

Stage history

2024-02-01Operational · datacenterdynamics.com
2026-02-20Expanding · datacenterdynamics.com

Who is behind it

OperatorSTT GDC India · Colocation
Funder, EquityST Telemedia

Who uses the compute

Checked on 2026-10-02. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

ArusGrid estimate, building costabout US$327m to US$487m

No figure has been announced. This range is 58 MW of planned IT load times a published benchmark of US$6.64 per watt for Mumbai, plus or minus 15 percent, with 10 percent more at the top for liquid cooling because the project is AI-positioned. It covers the building and its mechanical and electrical plant. It excludes land, grid works, servers and fees.

Benchmark: Turner & Townsend Data Centre Construction Cost Index 2025, as reported by Data Storage Asia. An estimate is never added to any total on the site.

Platform deals that include it

STT GDC India Rs 4,200 crore Tamil Nadu MoU
Country programme, 2026-02
US$504m

Platform capital spans several sites. It is never added to this project's own figure.

Colocation price per kW of IT load per month

ArusGrid estimate, grade CINR 6,800 to INR 8,900 (about USD 81 to 106)

ArusGrid estimate, grade C. Published band for this country. Priced on the hyperscale band, which already reflects anchor deals. No usable capex for this site. Electricity unstated in the band. An estimate, never a quote, computed by fixed rules published on the Colo prices page and never counted in any total.

market band, hyperscale (2024-12)INR 6,800 to INR 8,900 Cushman & Wakefield for Sify Infinit Spaces, 2025-10-16
Power supply
Renewable power dealCleanMax (Clean Max Enviro Energy Solutions) · 21 MW · Apr 2026 Inferred by ArusGrid source ↗
21 MWp new solar in Tamil Nadu in captive mode; STT GDC India takes 26% equity in the project; cumulative CleanMax-STT partnership >130MW · Release says the PPA powers STT GDC's Chennai data centres without naming sites; capacity is MWp solar, not facility load · Covers the operator's wider portfolio in this country, not this site alone.
Why we think so. Exchange press release by supplier
Grid supplyTNPDCL (Tamil Nadu Power Distribution Corporation, formerly TANGEDCO) · 85 MW · Dec 2025 Confirmed source ↗
The December 2025 EC amendment raised the approved power requirement from 49MW (TANGEDCO) to 85MW (TNPDCL). This is total power demand, not IT load. The approved layout includes a TNEB GIS building and an STT GIS building on site. · Applies to the whole campus.
Water and cooling
WaterMains drinking water · CMWSSB (Chennai Metro Water) · 215 m³ a day Confirmed source ↗
Approved fresh water fell from 418 KLD in the earlier EC to 215 KLD. Recycled water of 26 KLD goes to flushing and greenbelt. A 45 KLD MBR sewage plant is proposed.
Cooling Confirmed source ↗
Approved fresh water is 215 KLD, of which 200 KLD is HVAC make-up and 15 KLD domestic. The compliance report refers to on-site cooling towers. Chiller type is not stated.

Sources checked 2026-10-22

  1. STT GDC India Strengthens Its Market Presence in Chennai with Multi-Campus Expansion and INR 4,200 Crore Investment Commitment (STT GDC, 2026-02-19)
  2. STT GDC India launches data center in Chennai, targets potential IPO (DCD, 2026-02-20)
  3. STT GDC breaks ground on third Chennai data center campus in India (DCD, 2024-02-01)
  4. CleanMax and STT GDC India Scale Renewable Energy Partnership Beyond 130 MW to Power India's Sustainable, AI-Ready Digital Infrastructure (NSE / Clean Max Enviro Energy Solutions, 2026-04-01)
  5. EC Chennai Ambattur December 2025 (SEIAA-TN Amendment to Environmental Clearance, File No. 12753) (SEIAA Tamil Nadu, hosted by STT GDC India, 2025-12-19)
  6. Half Yearly Compliance Report 2026 - Chennai Ambattur (1 October 2025 - 31 March 2026) (STT GDC India (PARIVESH submission), 2026-07-04)

More in Chennai

Also run by STT GDC

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.