STT GDC Pune campus (Dighi) is a data center project in Pune (Dighi), India, operated by STT GDC India. It is operational and expanding. It is planned for 80 MW of IT load. The operator reports 40 MW running.
Latest change on record: entered the record as expanding on 31 May 2023. Record last checked against its sources on 21 October 2026.
This project is built or running, so every gate counts as passed.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How India approves, powers and taxes data centers is on Data center rules in India.
Pune holds 4 active projects with 255 MW of planned IT load between them, and STT GDC Pune campus (Dighi) ranks second by planned capacity. Of those, 1 is operational, 1 is operational and expanding, 1 is at the land and permitting stage and 1 is announced only. Published colocation vacancy in Pune was 19.4% as of June 2025. Vacancy excludes hyperscaler self-build.
STT GDC has 9 others in India and 15 projects elsewhere in the dataset tracked by ArusGrid, including STT GDC Bengaluru Devanahalli campus, STT Chennai Ambattur campus (Chennai 2, 3 and 4) and STT GDC Palava campus. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.
The build is phased. Buildings in service at 40 MW is operational; Expansion to five buildings at 40 MW is under construction. The stage was recorded as operational and expanding on 31 May 2023. The money on record is INR 20bn (about US$242m) as of May 2023, the announced investment.
The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 4 public sources for this project, the latest dated 2 October 2026, and last checked the record on 21 October 2026.
Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.
No public signal either way.
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.
The figure covers the whole campus.
ArusGrid estimate, grade C. Published band for this country. Priced on the hyperscale band, which already reflects anchor deals. No usable capex for this site. Electricity unstated in the band. An estimate, never a quote, computed by fixed rules published on the Colo prices page and never counted in any total.
All projects in Pune · All projects in India · All STT GDC projects · All projects operational and expanding · Data center rules in India · Full directory