AdaniConneX Pune is a data center project in Pune, India, operated by AdaniConneX. It is operational. The published capacity figure is 115 MW, and its basis is not stated as IT load. The operator reports 19 MW running.
Latest change on record: entered the record as operational on 29 July 2026. Record last checked against its sources on 22 October 2026.
This project is built or running, so every gate counts as passed.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How India approves, powers and taxes data centers is on Data center rules in India.
Pune holds 4 active projects with 255 MW of planned IT load between them, and AdaniConneX Pune ranks first by planned capacity. Of those, 1 is operational, 1 is operational and expanding, 1 is at the land and permitting stage and 1 is announced only. Published colocation vacancy in Pune was 19.4% as of June 2025. Vacancy excludes hyperscaler self-build.
AdaniConneX has 5 others in India tracked by ArusGrid, including AdaniConneX Hyderabad (Elikatta campus), AdaniConneX Taloja campus and AdaniConneX Noida. Named funding comes from Adani Enterprises and EdgeConneX. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.
The build is phased. Phase I at 9.6 MW is operational with a 2026 target; Phase II at 9.6 MW is operational with a 2026 target; Growth pipeline per Q1 FY27 deck at 96 MW is announced. The stage was recorded as operational on 29 July 2026.
The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 5 public sources for this project, the latest dated 15 October 2026, and last checked the record on 22 October 2026.
Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.
No public signal either way.
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
as of 2026-07-29
Adani release says Pune phase II 9.6 MW handed over to customer
Source · Adani Enterprises Ltd announces Q1 FY27 results (Adani Enterprises, 2026-07-29)
ArusGrid estimate, grade C. Published band for this country. Priced on the hyperscale band, which already reflects anchor deals. No usable capex for this site. Electricity unstated in the band. An estimate, never a quote, computed by fixed rules published on the Colo prices page and never counted in any total.