AdaniConneX Chennai 1 data center

Chennai, Tamil Nadu, India · Chennai market · location approximate to district level

AdaniConneX Chennai 1 is a data center project in Chennai, India, operated by AdaniConneX. It is operational. The published capacity figure is 50 MW, and its basis is not stated as IT load. The operator reports 17 MW running.

Latest change on record: entered the record as operational on 4 November 2022. Record last checked against its sources on 20 October 2026.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
50 MW
unstated
Running now
17 MW
Operators rarely publish this
Operator
AdaniConneX
Joint venture
AI workloads
No signal either way
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How India approves, powers and taxes data centers is on Data center rules in India.

Where it sits

Chennai holds 16 active projects with 819 MW of planned IT load between them, and AdaniConneX Chennai 1 ranks 7th by planned capacity. Of those, 10 are operational, 1 is operational and expanding, 2 are under construction, 2 are at the land and permitting stage and 1 is announced only. Published colocation vacancy in Chennai was 24.2% as of June 2025. Vacancy excludes hyperscaler self-build.

AdaniConneX has 5 others in India tracked by ArusGrid, including AdaniConneX Hyderabad (Elikatta campus), AdaniConneX Taloja campus and AdaniConneX Pune. Named funding comes from Adani Enterprises and EdgeConneX. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The build is phased. Phase 1 at 17 MW is operational with a 2022 target; Growth pipeline per Q1 FY27 deck at 33 MW is announced. The stage was recorded as operational on 4 November 2022.

The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 6 public sources for this project, the latest dated 27 September 2026, and last checked the record on 20 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusNo signal either way

No public signal either way.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

Phase 1 · Operational17 MW, target 2022
Growth pipeline per Q1 FY27 deck · Announced33 MW

Stage history

2022-11-04Operational · adaniconnex.com

Who is behind it

OperatorAdaniConneX · Joint venture
Funder, Joint venture partnerAdani Enterprises
Funder, Joint venture partnerEdgeConneX

Who uses the compute

Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Colocation price per kW of IT load per month

ArusGrid estimate, grade CINR 6,800 to INR 8,900 (about USD 81 to 106)

ArusGrid estimate, grade C. Published band for this country. Priced on the hyperscale band, which already reflects anchor deals. No usable capex for this site. Electricity unstated in the band. An estimate, never a quote, computed by fixed rules published on the Colo prices page and never counted in any total.

market band, hyperscale (2024-12)INR 6,800 to INR 8,900 Cushman & Wakefield for Sify Infinit Spaces, 2025-10-16
Land
Industrial estateSIPCOT IT Park (per press) · 5 acres · Dec 2021 Reported source ↗
W.Media and Capacity both place Chennai 1 in 'SIPCOT IT Park'; row city says Ambattur - location needs reconciling
Power supply
Power allocation or planNov 2022 Reported source ↗
Up to 100 percent renewable · Powered with up to 100 percent renewable energy. The purchase route is not stated. · Applies to the whole campus.

Sources checked 2026-10-20

  1. AdaniConneX Announces the Opening of its Flagship Data Center Campus in Chennai, India (AdaniConneX, 2022-11-04)
  2. AdaniConneX Data Centers (AdaniConneX, 2026-09-27)
  3. Adani Enterprises Investor Presentation Q1 FY27 (Adani Enterprises, 2026-08-01)
  4. AdaniConneX announces opening of Chennai 1 hyperscale data centre campus (Indian Infrastructure, 2022-11-12)
  5. AdaniConneX to launch Chennai's largest hyperscale DC facility by June 2022 (W.Media, 2021-12-02)
  6. AdaniConneX Seals the Largest Data Center Financing Deal in India with a USD 213 Mn Construction Financing Facility (EdgeConneX, 2023-06-23)

More in Chennai

Also run by AdaniConneX

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.