AdaniConneX Noida is a data center project in Noida, India, operated by AdaniConneX. It is operational and expanding. The published capacity figure is 60 MW, and its basis is not stated as IT load. The operator reports 10 MW running.
Latest change on record: moved to expanding on 29 July 2026. Record last checked against its sources on 22 October 2026.
This project is built or running, so every gate counts as passed.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How India approves, powers and taxes data centers is on Data center rules in India.
NCR holds 12 active projects with 1,055 MW of planned IT load between them, and AdaniConneX Noida ranks 4th by planned capacity. Of those, 4 are operational, 2 are operational and expanding, 2 are under construction and 4 are announced only. Published colocation vacancy in NCR was 44% as of June 2025. Vacancy excludes hyperscaler self-build.
AdaniConneX has 5 others in India tracked by ArusGrid, including AdaniConneX Hyderabad (Elikatta campus), AdaniConneX Taloja campus and AdaniConneX Pune. It sits on the AdaniConneX Noida campus. Named funding comes from Adani Enterprises and EdgeConneX. The named user of the compute is Google (confirmed).
The build is phased. Phase 1 (Sector 62) at 10 MW is operational with a 2025 target; Growth pipeline per Q1 FY27 deck at 50 MW is under construction; Sector 80 (10 acres) is land and permitting. The dated record runs from past financial close on 23 June 2023 to operational and expanding on 29 July 2026. Power comes from Paschimanchal Vidyut Vitran Nigam (PVVNL) through grid supply (reported, unconfirmed).
The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 12 public sources for this project, the latest dated 27 September 2026, and last checked the record on 22 October 2026.
Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.
Confirmed hyperscaler tenant (Google, registered lease of 464,460 sq ft) in a 2022-plus greenfield build.
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
464,460 sq ft, 10-year registered lease · as of 2022-10-11
Lease documents accessed by CRE Matrix show Raiden Infotech India (Google) leasing 464,460 sq ft at Sector 62 Noida from DC Development Noida Ltd (Adani Enterprises) for 10 years at Rs 235 per sq ft per month, annual rent starting Rs 130.89 crore. DC Development Noida is the AdaniConneX Noida vehicle.
Source · Google takes on lease 464,000 sq ft space at Adani data centre in Noida (Business Standard, 2022-10-11)
Source · Google to lease Adani data center in Noida, India - report (DCD, 2022-10-12)
registered lease, Google (Raiden Infotech India) 464,460 sq ft, 10 years, 1 percent escalation Electricity excluded. As of 2022-09. Realty+ reporting the registered lease, 2022-10-13
Shell rent per square foot, which is a different product from colocation per kW. Starting annual rent INR 130.89 crore.
A powered shell leased to its tenant, which is a different product from colocation, so no per kW price applies.
All projects in NCR · All projects in India · All AdaniConneX projects · All projects operational and expanding · Data center rules in India · Full directory