Sify Noida 02 data center

Noida, Uttar Pradesh, India · NCR market · location approximate to district level

Sify Noida 02 is a data center project in Noida, India, operated by Sify Infinit Spaces. It is operational. It is planned for 26 MW of IT load. The operator reports 4.32 MW running.

Latest change on record: moved to operational on 27 September 2026. Record last checked against its sources on 21 October 2026.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
26 MW
Running now
4.32 MW
Operators rarely publish this
Operator
Sify Infinit Spaces
Colocation
AI workloads
Likely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How India approves, powers and taxes data centers is on Data center rules in India.

Where it sits

NCR holds 12 active projects with 1,055 MW of planned IT load between them, and Sify Noida 02 ranks 11th by planned capacity. Of those, 4 are operational, 2 are operational and expanding, 2 are under construction and 4 are announced only. Published colocation vacancy in NCR was 44% as of June 2025. Vacancy excludes hyperscaler self-build.

Sify has 4 others in India tracked by ArusGrid, including Sify Rabale campus, Sify Chennai 02 Siruseri campus and Sify Vizag AI data centre and open CLS. It sits on the Sify Noida campus. Named funding comes from Sify Technologies on the equity side. No user of the capacity is on the public record as of 2026-10-02, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The dated record runs from operational in March 2025 to operational on 27 September 2026. Power comes from unknown through a dedicated substation at 220 kV (reported, unconfirmed). Cooling uses air cooling.

The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 5 public sources for this project, the latest dated 27 September 2026, and last checked the record on 21 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Operator markets the building as an Nvidia DGX-Ready data centre with liquid cooling and 130kW per rack support. That is a readiness certification with no dated deployment, so the status stays at likely.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

Tower B (4.32MW installed at Jun 2025) · Operational26 MW

Stage history

2025-03Operational · indianinfrastructure.com
2026-09-27Operational · sifytechnologies.com

Who is behind it

OperatorSify Infinit Spaces · Colocation
Funder, EquitySify Technologies

Who uses the compute

Checked on 2026-10-02. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

ArusGrid estimate, building costabout US$146m to US$218m

No figure has been announced. This range is 26 MW of planned IT load times a published benchmark of US$6.64 per watt for Mumbai, plus or minus 15 percent, with 10 percent more at the top for liquid cooling because the project is AI-positioned. It covers the building and its mechanical and electrical plant. It excludes land, grid works, servers and fees.

Benchmark: Turner & Townsend Data Centre Construction Cost Index 2025, as reported by Data Storage Asia. An estimate is never added to any total on the site.

Colocation price per kW of IT load per month

ArusGrid estimate, grade CINR 7,650 to INR 11,900 (about USD 91 to 142)

ArusGrid estimate, grade C. Published band for this country. Priced on the wholesale band. No usable capex for this site. Electricity unstated in the band. An estimate, never a quote, computed by fixed rules published on the Colo prices page and never counted in any total.

market band, wholesale (2024-12)INR 7,650 to INR 11,900 Cushman & Wakefield for Sify Infinit Spaces, 2025-10-16
Power supply
Dedicated substationunknown · 220kV Reported source ↗
Operator states a dedicated 220kV on-premise substation
Water and cooling
CoolingAir cooled Confirmed source ↗
Air-cooled chillers with high water temperature and adiabatic cooling accessories, N+2 redundancy.

Sources checked 2026-10-21

  1. Biggest AI-Ready Hyperscale Data Center in North India (Sify (site, undated, accessed), 2026-09-27)
  2. Data Center in Noida | Hyperscale & Colocation | Sify (Sify (site, undated, accessed), 2026-09-27)
  3. Sify Infinit Spaces Limited Draft Red Herring Prospectus (Sify Infinit Spaces Limited via NSE, 2025-10-16)
  4. Sify launches North India's largest AI-ready data centre campus in Noida (Indian Infrastructure, 2025-03-11)
  5. Noida 02 Factsheet (Sify Technologies)

More in NCR

Also run by Sify

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.