Yotta D1 is a data center project in Greater Noida, India, operated by Yotta Data Services. It is operational. It is planned for 29 MW of IT load.

Latest change on record: moved to operational on 31 October 2022. Record last checked against its sources on 22 October 2026.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
29 MW
Running now
Not disclosed
Operators rarely publish this
Operator
Yotta Data Services
Colocation
AI workloads
Likely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How India approves, powers and taxes data centers is on Data center rules in India.

Where it sits

NCR holds 12 active projects with 1,055 MW of planned IT load between them, and Yotta D1 ranks 9th by planned capacity. Of those, 4 are operational, 2 are operational and expanding, 2 are under construction and 4 are announced only. Published colocation vacancy in NCR was 44% as of June 2025. Vacancy excludes hyperscaler self-build.

Yotta has 4 others in India tracked by ArusGrid, including Yotta D4, Yotta NM2 and Yotta D2. It sits on the Yotta Greater Noida Data Center Park alongside Yotta D2. Named funding comes from Hiranandani Group on the equity side. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The dated record runs from under construction in January 2021 to operational on 31 October 2022. The money on record is INR 15bn (about US$183m) as of October 2022, the announced investment. Cooling uses hybrid air and liquid cooling, with a design PUE of 1.4.

The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 10 public sources for this project, the latest dated 27 September 2026, and last checked the record on 22 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

GPU-cloud operator (Shakti Cloud). Yotta says 10,000+ GPUs are in production across its sites (Feb 2026) but does not split them by building; the bulk of the H100 fleet is publicly tied to Navi Mumbai NM1.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

D1 · Operational29 MW, target 2022

Stage history

2021-01Under construction · datacenterdynamics.com
2022-10-31Operational · yotta.com

Who is behind it

OperatorYotta Data Services · Colocation
Funder, EquityHiranandani Group

Who uses the compute

Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

Announced investment, 2022-10INR 15bn (about US$183m)

Platform deals that include it

Yotta Rs 39,000 crore MoU with Uttar Pradesh over 5 to 7 years
Country programme, 2022-10-31
US$4.8bn

Platform capital spans several sites. It is never added to this project's own figure.

Colocation price per kW of IT load per month

ArusGrid estimate, grade CINR 7,650 to INR 11,900 (about USD 91 to 142)

ArusGrid estimate, grade C. Published band for this country. Priced on the wholesale band. Cost floor from the site's stated capex of US$6.4m per MW at a 12 to 14 percent yield on cost over a 80 percent NOI margin, below the band. Electricity unstated in the band. An estimate, never a quote, computed by fixed rules published on the Colo prices page and never counted in any total.

market band, wholesale (2024-12)INR 7,650 to INR 11,900 Cushman & Wakefield for Sify Infinit Spaces, 2025-10-16
cost floor from stated capexINR 6,510 to INR 7,595
Land
Allocated byGreater Noida Industrial Development Authority · 20 acres · Oct 2022 Reported source ↗
20-acre park for six buildings per the 2022 launch release; allotment terms not published
Power supply
Dedicated substation220kV · Nov 2021 Confirmed source ↗
Customers can opt for 100% green energy · Redundant 220kV express feeders with an on-site substation. The park is quoted at more than 250MW of power (campus connected power, not IT). Utility not named. · Applies to the whole campus.
Water and cooling
CoolingHybrid air and liquid cooling · design PUE 1.4 Confirmed source ↗
23 chillers of 540 tonnes in N+2 with adiabatic and free cooling, plus N+2 PAHUs.
WaterRecycled wastewater · Greater Noida Industrial Development Authority (GNIDA) · 50 m³ a day Reported source ↗
Park-level figures for the Yotta Greater Noida park, where D1 is the operating building. GNIDA says it supplies 50 KLD of treated water. Yotta says cooling uses about 5 lakh litres a month, all from GNIDA's treated non-potable network, plus its own 50 KLD STP, and that it uses no groundwater. The approved water limit is 120 KLD.

Sources checked 2026-10-22

  1. Yotta Launches North India's First Hyperscale Data Center – Yotta D1 – in Greater Noida (Yotta, 2022-10-31)
  2. Top Data Center in Delhi NCR, Greater Noida - Yotta D1 (Yotta (product page, undated, accessed), 2026-09-27)
  3. Yotta launches data center in Noida, India (DCD, 2022-11-01)
  4. Yotta unveils single-story data centers in Mumbai and Greater Noida (NewsBytes, 2026-09-09)
  5. Yotta to Commence Construction of Two More Data Center Buildings in its Greater Noida DC Park (Yotta Data Services, 2021-11-29)
  6. Yotta Data Center, Noida: North India's first major Digital Hub (Biltrax Media, 2024-11-09)
  7. Yotta Data Centers (Yotta Data Services, 2024-01-01)
  8. GREATER NOIDA AI COMPUTE DEPLOYMENT (Gorilla Technology)
  9. India's digital thirst: Data centres are rising in water-scarce regions — and locals are paying the price (Down To Earth, 2025-11-04)
  10. UP CM Yogi Adityanath lays foundation stone for data centre in Greater Noida, orders setting up of hospital near Jewar (Deccan Herald (PTI), 2020-11-30)

Same campus, Yotta Greater Noida Data Center Park

More in NCR

Also run by Yotta

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.