STT Noida 2 data center

Noida, Uttar Pradesh, India · NCR market · location approximate to district level

STT Noida 2 is a data center project in Noida, India, operated by STT GDC India. It has been announced and has not yet reached the land or permitting stage. It is planned for 22 MW of IT load.

Latest change on record: entered the record as announced on 22 January 2021. Record last checked against its sources on 22 October 2026.

Open on the mapSuggest a correction
Stage
Announced
Planned IT load
22 MW
Running now
Not disclosed
Operators rarely publish this
Operator
STT GDC India
Colocation
AI workloads
No signal either way
Evidence grade
Sourced
Will it get built?Long shot1 of 7 gates passed
○ Land secured○ Power arranged○ Approvals granted✓ Money committed○ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Land secured.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How India approves, powers and taxes data centers is on Data center rules in India.

Where it sits

NCR holds 12 active projects with 1,055 MW of planned IT load between them, and STT Noida 2 ranks 12th by planned capacity. Of those, 4 are operational, 2 are operational and expanding, 2 are under construction and 4 are announced only. Published colocation vacancy in NCR was 44% as of June 2025. Vacancy excludes hyperscaler self-build.

STT GDC has 9 others in India and 15 projects elsewhere in the dataset tracked by ArusGrid, including STT GDC Bengaluru Devanahalli campus, STT GDC Pune campus (Dighi) and STT Chennai Ambattur campus (Chennai 2, 3 and 4). It sits on the STT Noida campus alongside STT Noida 3. Named funding comes from ST Telemedia on the equity side. No user of the capacity is on the public record as of 2026-10-02, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The stage was recorded as announced only on 22 January 2021.

The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 4 public sources for this project, the latest dated 27 September 2026, and last checked the record on 22 October 2026.

How well evidenced is it

One or two hard signals sit behind the announcement. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusNo signal either way

No public signal either way.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

Noida 2 · Announced22 MW

Stage history

2021-01-22Announced · datacenterdynamics.com

Who is behind it

OperatorSTT GDC India · Colocation
Funder, EquityST Telemedia

Who uses the compute

Checked on 2026-10-02. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

ArusGrid estimate, building costabout US$124m to US$168m

No figure has been announced. This range is 22 MW of planned IT load times a published benchmark of US$6.64 per watt for Mumbai, plus or minus 15 percent. It covers the building and its mechanical and electrical plant. It excludes land, grid works, servers and fees.

Benchmark: Turner & Townsend Data Centre Construction Cost Index 2025, as reported by Data Storage Asia. An estimate is never added to any total on the site.

Colocation price per kW of IT load per month

ArusGrid estimate, grade CINR 7,650 to INR 11,900 (about USD 91 to 142)

ArusGrid estimate, grade C. Published band for this country. Priced on the wholesale band. No usable capex for this site. Electricity unstated in the band. An estimate, never a quote, computed by fixed rules published on the Colo prices page and never counted in any total.

market band, wholesale (2024-12)INR 7,650 to INR 11,900 Cushman & Wakefield for Sify Infinit Spaces, 2025-10-16
Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources checked 2026-10-22

  1. Data Centre in Noida | Colocation Services in Noida | STT GDC India (STT GDC (site, undated, accessed), 2026-09-27)
  2. STT proposes greenfield data center campus in Noida, India (DCD, 2021-01-22)
  3. STT GDC India expands Chennai footprint as part of ₹4,200 cr commitment (Communications Today, 2026-02-20)
  4. STT GDC India signs MoU with UP Government (STT GDC India, 2023-02-10)

Same campus, STT Noida

More in NCR

Also run by STT GDC

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.