AM Group AI compute hub, Jewar is a data center project in Jewar (Yamuna Expressway), India, operated by AM Group (AM AI Labs). It has been announced and has not yet reached the land or permitting stage. The published capacity figure is 350 MW, and its basis is not stated as IT load.
Latest change on record: entered the record as announced on 17 February 2026. Record last checked against its sources on 22 October 2026.
Next gate to watch: Approvals granted.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How India approves, powers and taxes data centers is on Data center rules in India.
NCR holds 12 active projects with 1,055 MW of planned IT load between them, and AM Group AI compute hub, Jewar ranks first by planned capacity. Of those, 4 are operational, 2 are operational and expanding, 2 are under construction and 4 are announced only. Published colocation vacancy in NCR was 44% as of June 2025. Vacancy excludes hyperscaler self-build.
It is the only AM Group, founders of Greenko project ArusGrid tracks. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.
The build is phased. Phase 1 at 150 MW is announced with a 2028 target; Phase 2 at 200 MW is announced with a 2028 target. The stage was recorded as announced only on 17 February 2026. The money on record is US$25bn as of February 2026, the announced investment. Power comes from Not named (AM Group renewables and pumped storage) through a renewable power purchase agreement (reported, unconfirmed).
The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 5 public sources for this project, the latest dated 7 September 2026, and last checked the record on 22 October 2026.
Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.
Marketed as a 1 GW AI and HPC hub with carbon free power. No tenant named.
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.
The figure covers the whole campus.
ArusGrid estimate, grade C. Published band for this country. Priced on the hyperscale band, which already reflects anchor deals. No usable capex for this site. Electricity unstated in the band. An estimate, never a quote, computed by fixed rules published on the Colo prices page and never counted in any total.
All projects in NCR · All projects in India · All projects announced only · Data center rules in India · Full directory