Sify Chennai 02 Siruseri campus is a data center project in Chennai, India, operated by Sify Infinit Spaces. It is operational. It is planned for 52 MW of IT load. The operator reports 4.32 MW running.
Latest change on record: entered the record as operational on 17 April 2025. Record last checked against its sources on 21 October 2026.
This project is built or running, so every gate counts as passed.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How India approves, powers and taxes data centers is on Data center rules in India.
Chennai holds 16 active projects with 819 MW of planned IT load between them, and Sify Chennai 02 Siruseri campus ranks 6th by planned capacity. Of those, 10 are operational, 1 is operational and expanding, 2 are under construction, 2 are at the land and permitting stage and 1 is announced only. Published colocation vacancy in Chennai was 24.2% as of June 2025. Vacancy excludes hyperscaler self-build.
Sify has 4 others in India tracked by ArusGrid, including Sify Rabale campus, Sify Vizag AI data centre and open CLS and Sify Noida 02. It sits on the Sify Siruseri campus. Named funding comes from IFC as debt. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.
The build is phased. Tower B built (4.32MW installed at Jun 2025) at 26 MW is operational with a 2025 target; Tower B completion (IPO-funded) at 26 MW is announced with a 2028 target. The stage was recorded as operational on 17 April 2025. Power comes from TNEB grid through a dedicated substation at 230 kV. Cooling uses hybrid air and liquid cooling.
The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 7 public sources for this project, the latest dated 21 August 2026, and last checked the record on 21 October 2026.
Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.
Nvidia DGX-Ready Data Center certification for liquid cooling, dated 6 May 2025, covering Chennai 02 Siruseri; operator page states 130+ kW per rack with liquid and air cooling. The certification attests capability and names no GPU deployment.
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.
No figure has been announced. This range is 52 MW of planned IT load times a published benchmark of US$6.64 per watt for Mumbai, plus or minus 15 percent, with 10 percent more at the top for liquid cooling because the project is AI-positioned. It covers the building and its mechanical and electrical plant. It excludes land, grid works, servers and fees.
Benchmark: Turner & Townsend Data Centre Construction Cost Index 2025, as reported by Data Storage Asia. An estimate is never added to any total on the site.
ArusGrid estimate, grade C. Published band for this country. Priced on the hyperscale band, which already reflects anchor deals. No usable capex for this site. Electricity unstated in the band. An estimate, never a quote, computed by fixed rules published on the Colo prices page and never counted in any total.
All projects in Chennai · All projects in India · All Sify projects · All projects operational · Data center rules in India · Full directory