ArusGrid tracks 4 active data center projects in Pune, India, with 255 MW of planned IT load. Of these, 1 is operational, 1 is operational and expanding, 1 is at the land and permitting stage and 1 is announced only. Operators have disclosed 59 MW actually running, a figure most of them do not publish.
The largest project is AdaniConneX Pune at 115 MW, operational. The operators with the most planned capacity here are AdaniConneX (115 MW across 1 project), STT GDC (80 MW across 1 project) and TCC Concept Limited (60 MW across 1 project). Published colocation vacancy in Pune was 19.4% as of June 2025. Vacancy excludes hyperscaler self-build.
The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”.
| Project | City | Stage | Planned MW | Running MW | Operator | AI |
|---|---|---|---|---|---|---|
| AdaniConneX Pune | Pune | Operational | 115 * | 19 | AdaniConneX | No signal either way |
| STT GDC Pune campus (Dighi) | Pune (Dighi) | Expanding | 80 | 40 | STT GDC India | No signal either way |
| NES Data Hinjewadi 60MW campus | Pune | Announced | 60 | undisclosed | NES Data | |
| Microsoft Pune (Hinjewadi) | Pune | Land and permitting | none published | undisclosed | Microsoft | Likely |
AdaniConneX · STT GDC · Microsoft