Data center projects in Hyderabad

India · India · dataset updated 2026-10-18

ArusGrid tracks 15 active data center projects in Hyderabad, India, with 1,128 MW of planned IT load. Of these, 5 are operational, 3 are under construction, 3 are at the land and permitting stage and 4 are announced only. Projects under construction or commissioning account for 277 MW and operational sites for 358 MW of planned capacity. Operators have disclosed 19 MW actually running, a figure most of them do not publish.

The largest project is AdaniConneX Hyderabad (Elikatta campus) at 358 MW, operational. The operators with the most planned capacity here are AdaniConneX (358 MW across 1 project), CtrlS (250 MW across 1 project) and AirTrunk (243 MW across 1 project). Published colocation vacancy in Hyderabad was 23.4% as of June 2025. Vacancy excludes hyperscaler self-build.

The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”.

Open the mapPipeline view

All projects largest planned capacity first

ProjectCityStagePlanned MWRunning MWOperatorAI
AdaniConneX Hyderabad (Elikatta campus)Elikatta, ShadnagarOperational358 *19AdaniConneXLikely
CtrlS Chandanvelly datacenter parkChandanvellyUnder construction250 *undisclosedCtrlS DatacentersLikely
AirTrunk HYD1ChandanvellyAnnounced243 *undisclosedAirTrunkLikely
UPC-Volt Bharat Future City AI data centreBharat Future CityAnnounced100 *undisclosedUPC-Volt JVLikely
PDG HY1HyderabadLand and permitting90undisclosedPrinceton Digital GroupLikely
Nxtra by Airtel Hyderabad hyperscale campusHyderabadAnnounced60undisclosedNxtra Data
CapitaLand DC ITPHHyderabadUnder construction27undisclosedCapitaLand Data CentreNo signal either way
AWS Asia Pacific (Hyderabad) region, existing sitesHyderabadOperationalnone publishedundisclosedAmazon Web ServicesLikely
AWS Bharat Future City campusBharat Future City (Meerkhanpet)Under constructionnone publishedundisclosedAmazon Web ServicesLikely
Fortune AI Data Centre Park, KandukurKandukur (Thimmaipally, Ranga Reddy)Land and permittingnone publishedundisclosedFortune Hospitality & Infra LLP (SPV Sudeeksha Estates LLP)Likely
Microsoft Hyderabad Chandanvelly campus (HYD11)ChandanvellyOperationalnone publishedundisclosedMicrosoftLikely
Microsoft Hyderabad Mekaguda campus (HYD01)MekagudaOperationalnone publishedundisclosedMicrosoftLikely
Microsoft Hyderabad Shadnagar campus (HYD04)ShadnagarOperationalnone publishedundisclosedMicrosoftLikely
STT GDC Hyderabad Meerkhanpet campusMeerkhanpetAnnouncednone publishedundisclosedSTT GDC IndiaLikely
TCS HyperVault Hyderabad AI campusHyderabadLand and permittingnone publishedundisclosedHyperVault (TCS)Likely

Cities in this market

Other markets in India

Operators here with their own page

* marks a capacity figure whose source states a basis other than IT load. Planned MW is IT load unless marked. Running capacity is rarely published, so a missing figure means undisclosed. Cancelled projects are listed and excluded from every total. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. This page is generated from the dataset, so it cannot drift from the map.