CtrlS Chandanvelly datacenter park is a data center project in Chandanvelly, India, operated by CtrlS Datacenters. It is under construction. The only published capacity figure is a 250 MW grid connection. IT load will be lower.
Latest change on record: moved to under construction on 8 September 2025. Record last checked against its sources on 22 October 2026.
Next gate to watch: Money committed.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How India approves, powers and taxes data centers is on Data center rules in India.
Hyderabad holds 15 active projects with 1,128 MW of planned IT load between them, and CtrlS Chandanvelly datacenter park ranks second by planned capacity. Of those, 5 are operational, 3 are under construction, 3 are at the land and permitting stage and 4 are announced only. Published colocation vacancy in Hyderabad was 23.4% as of June 2025. Vacancy excludes hyperscaler self-build.
CtrlS has 4 others in India tracked by ArusGrid, including CtrlS Mumbai datacenter campus (DC1 to DC7), CtrlS Bodh Gaya AI Factory and CtrlS Chennai datacenter park (DC1 and DC2). No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.
The dated record runs from announced only on 20 January 2025 to under construction on 8 September 2025. The money on record is INR 100bn (about US$1.2bn) as of January 2025, the announced investment. Power comes from Not named (Telangana grid) through a dedicated substation (reported, unconfirmed). Cooling uses hybrid air and liquid cooling.
The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 7 public sources for this project, the latest dated 6 May 2026, and last checked the record on 22 October 2026.
Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.
Reaching this stage requires a dated construction source, which corroborates the project on its own.
Operator states direct liquid and immersion cooling up to 300kW per rack.
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.
The figure covers the whole campus.
ArusGrid estimate, grade C. Published band for this country. Priced on the hyperscale band, which already reflects anchor deals. No usable capex for this site. Electricity unstated in the band. An estimate, never a quote, computed by fixed rules published on the Colo prices page and never counted in any total.