AWS Bharat Future City campus is a data center project in Bharat Future City (Meerkhanpet), India, operated by Amazon Web Services. It is under construction. The operator has not published a capacity figure, and ArusGrid does not estimate one.
Latest change on record: moved to under construction on 15 July 2026. Record last checked against its sources on 13 October 2026.
Next gate to watch: Power arranged.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How India approves, powers and taxes data centers is on Data center rules in India.
Hyderabad holds 15 active projects with 1,128 MW of planned IT load between them, and AWS Bharat Future City campus has no published figure so it sits outside that ranking. Of those, 5 are operational, 3 are under construction, 3 are at the land and permitting stage and 4 are announced only. Published colocation vacancy in Hyderabad was 23.4% as of June 2025. Vacancy excludes hyperscaler self-build.
AWS has 4 others in India and 7 projects elsewhere in the dataset tracked by ArusGrid, including AWS Thane (Balkum-Majiwada), AWS Asia Pacific (Hyderabad) region, existing sites and AWS Palava. It sits on the AWS Asia Pacific (Hyderabad) campus alongside AWS Asia Pacific (Hyderabad) region, existing sites. The named user of the compute is Amazon Web Services (reported, unconfirmed).
The dated record runs from announced only on 23 January 2025 to under construction on 15 July 2026.
The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 5 public sources for this project, the latest dated 15 September 2026, and last checked the record on 13 October 2026.
Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.
Reaching this stage requires a dated construction source, which corroborates the project on its own.
Hyperscaler self-build groundbreaking 2026 for AI and cloud demand.
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
Self-build, 202 acres at Bharat Future City plus 98 acres at Chandanvelly, about Rs 60,000 crore over ten years · as of 2026-07-16
Foundation stone laid for AWS's data centre at Bharat Future City (Meerkhanpet) with Telangana government; first phase within two years. No customer named.
Source · Foundation stone laid for AWS data center development in Telangana, India (DCD, 2026-07-16)
Platform capital spans several sites. It is never added to this project's own figure.
An own-use build. No colocation price applies.