ArusGridProject
Directory › Malaysia › Klang Valley › AWS Asia Pacific (Malaysia) Region (3 AZs, Klang Valley)

AWS Asia Pacific (Malaysia) Region (3 AZs, Klang Valley) data center

Cyberjaya / Bukit Jalil (TPM), Selangor, Malaysia · Klang Valley market · location approximate to city level

Also listed as Amazon data center Bukit Jalil and AWS Malaysia region.

AWS Asia Pacific (Malaysia) Region (3 AZs, Klang Valley) is a data center project in Cyberjaya / Bukit Jalil (TPM), Malaysia, operated by Amazon Web Services. It is operational and expanding. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Record last checked against its sources on 20 October 2026.

Open on the mapSuggest a correction
Stage
Expanding
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
Amazon Web Services
Hyperscaler self-build
AI workloads
Likely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Malaysia approves, powers and taxes data centers is on Data center rules in Malaysia.

Where it sits

Klang Valley holds 33 active projects with 1,911 MW of planned IT load between them, and AWS Asia Pacific (Malaysia) Region (3 AZs, Klang Valley) has no published figure so it sits outside that ranking. Of those, 5 are operational, 5 are operational and expanding, 10 are under construction, 7 are at the land and permitting stage and 6 are announced only. No third party publishes a colocation vacancy rate for Klang Valley, and ArusGrid does not estimate one.

AWS has 1 other in Malaysia and 10 projects elsewhere in the dataset tracked by ArusGrid, including AWS Sepang (Dengkil) land. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The build is phased. Region launch is operational with a 2024 target; Cyberjaya build-out (Sunway RM748m) is under construction with a 2027 target.

Grid power for a large industrial user in Malaysia costs about US$0.14 per kWh as of July 2025, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Malaysia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 3 public sources for this project, and last checked the record on 20 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsNo

AI workloads

StatusLikely

hyperscaler self-build; AWS cites GenAI demand

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectYes
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

Region launch · OperationalSize not published, target 2024
Cyberjaya build-out (Sunway RM748m) · Under constructionSize not published, target 2027

Who is behind it

OperatorAmazon Web Services · Hyperscaler self-build

Who uses the compute

Built for Amazon Web Services's own use. No customer workload has been tied to this building on the public record.

Platform deals that include it

AWS Malaysia region program
Country programme, 2024-08
US$6.2bn

Platform capital spans several sites. It is never added to this project's own figure.

Colocation price per kW of IT load per month

An own-use build. No colocation price applies.

Project team
Engineering consultantAvant Aegis · 2025 Confirmed source ↗
BIM modelling (architecture, structure and MEP at LOD 350 to 500) and coordination for AWS data centres KUL070 and KUL072 in Cyberjaya and Bukit Jalil. Listed as ongoing in 2025.
Possibly linked
The source does not name the project, and more than one project we track fits. We show it on each of them and pin it to none.
UnconfirmedSunway Construction Sdn Bhd · Main contractor · RM747.8m (≈US$168m) · Mar 2024 source ↗
This project is one of 2 that fit. The other is Microsoft Malaysia West Region (3 sites, Greater KL).
UnconfirmedSunway ENGIE DC Sdn Bhd · Mechanical and electrical works · Jul 2024 source ↗
This project is one of 2 that fit. The other is Microsoft Malaysia West Region (3 sites, Greater KL).
UnconfirmedGamuda Engineering Sdn Bhd · Civil and structural works · RM451.4m (≈US$102m) · Nov 2024 source ↗
This project is one of 2 that fit. The other is Microsoft Malaysia West Region (3 sites, Greater KL).
UnconfirmedSunway Construction Sdn Bhd · Main contractor · RM747.8m (≈US$168m) · Mar 2024 source ↗
This project is one of 4 that fit. The others are Google (Pearl Computing) Elmina Data Centre & Cloud Region, EdgeConneX Cyberjaya Campus, Vantage KUL2.
UnconfirmedGamuda Engineering Sdn Bhd · Civil and structural works · RM451.4m (≈US$102m) · Oct 2024 source ↗
This project is one of 2 that fit. The other is EdgeConneX Cyberjaya Campus.

Sources checked 2026-10-20

  1. aws.amazon.com
  2. datacenterdynamics.com
  3. Amazon AWS Data Center. (Avant Aegis)

More in Klang Valley

Also run by AWS

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.