Infinaxis CDC1 data center

Cyberjaya, Selangor, Malaysia · Klang Valley market · location approximate to city level

Infinaxis CDC1 is a data center project in Cyberjaya, Malaysia, operated by Infinaxis (Gaw Capital / A3 Capital JV). It is operational. It is planned for 12 MW of IT load.

Latest change on record: entered the record as operational on 20 January 2026. Record last checked against its sources on 11 September 2026.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
12 MW
Running now
Not disclosed
Operators rarely publish this
Operator
Infinaxis (Gaw Capital / A3 Capital JV)
Joint venture
AI workloads
Confirmed
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Malaysia approves, powers and taxes data centers is on Data center rules in Malaysia.

Where it sits

Klang Valley holds 33 active projects with 1,911 MW of planned IT load between them, and Infinaxis CDC1 ranks 15th by planned capacity. Of those, 5 are operational, 5 are operational and expanding, 10 are under construction, 7 are at the land and permitting stage and 6 are announced only. No third party publishes a colocation vacancy rate for Klang Valley, and ArusGrid does not estimate one.

It is the only Infinaxis project ArusGrid tracks. Named funding comes from Gaw Capital Partners on the equity side and A3 Capital. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The stage was recorded as operational on 20 January 2026.

Grid power for a large industrial user in Malaysia costs about US$0.14 per kWh as of July 2025, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Malaysia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 3 public sources for this project, the latest dated 20 January 2026, and last checked the record on 11 September 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed client (reported)Yes
Committed or approved capitalNo
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusConfirmed

up to 80kW/rack design

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

Phase 1 · Operational12 MW, target 2026

Stage history

2026-01-20Operational · english.cscec.com

Who is behind it

OperatorInfinaxis (Gaw Capital / A3 Capital JV) · Joint venture
Funder, EquityGaw Capital Partners
Funder, Joint venture partnerA3 Capital

Who uses the compute

Tenant · enterpriseUnnamed (>80% Ph1 pre-committed) · reported, unconfirmed

Checked on 2026-10-01. No document names a confirmed user beyond the rows above.

Money at this site

ArusGrid estimate, building costabout US$116m to US$173m

No figure has been announced. This range is 12 MW of planned IT load times a published benchmark of US$11.37 per watt for Malaysia, plus or minus 15 percent, with 10 percent more at the top for liquid cooling because the project is AI-positioned. It covers the building and its mechanical and electrical plant. It excludes land, grid works, servers and fees.

Benchmark: Turner & Townsend Data Centre Construction Cost Index 2025, as reported by Data Storage Asia. An estimate is never added to any total on the site.

Colocation price per kW of IT load per month

No published price band exists for Malaysia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources checked 2026-09-11

  1. gawcapital.com
  2. datacenterdynamics.com
  3. CSCEC-built Infinaxis Data Center project in Malaysia enters operation (China State Construction Engineering Corporation, 2026-01-20)

More in Klang Valley

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.