EdgeConneX KL CBD data center

Kuala Lumpur, Malaysia · Klang Valley market · location approximate to city level

EdgeConneX KL CBD is a data center project in Kuala Lumpur, Malaysia, operated by EdgeConneX. It has been announced and has not yet reached the land or permitting stage. It is planned for 17 MW of IT load.

Record last checked against its sources on 20 October 2026.

Open on the mapSuggest a correction
Stage
Announced
Planned IT load
17 MW
Running now
Not disclosed
Operators rarely publish this
Operator
EdgeConneX
Colocation
AI workloads
No signal either way
Evidence grade
Sourced
Will it get built?Long shot1 of 7 gates passed
○ Land secured○ Power arranged○ Approvals granted✓ Money committed○ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Land secured.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Malaysia approves, powers and taxes data centers is on Data center rules in Malaysia.

Where it sits

Klang Valley holds 33 active projects with 1,911 MW of planned IT load between them, and EdgeConneX KL CBD ranks 14th by planned capacity. Of those, 5 are operational, 5 are operational and expanding, 10 are under construction, 7 are at the land and permitting stage and 6 are announced only. No third party publishes a colocation vacancy rate for Klang Valley, and ArusGrid does not estimate one.

EdgeConneX has 3 others in Malaysia and 2 projects elsewhere in the dataset tracked by ArusGrid, including EdgeConneX Cyberjaya Campus, EdgeConneX Johor and EdgeConneX Bukit Jalil. Named funding comes from EQT on the equity side. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The build is phased. Phase 1 at 6 MW is announced; Full build at 17 MW is announced.

Grid power for a large industrial user in Malaysia costs about US$0.14 per kWh as of July 2025, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Malaysia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 3 public sources for this project, the latest dated 1 March 2026, and last checked the record on 20 October 2026.

How well evidenced is it

One or two hard signals sit behind the announcement. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusNo signal either way

no cooling/density/tenant signal published

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

Phase 1 · Announced6 MW
Full build · Announced17 MW

Who is behind it

OperatorEdgeConneX · Colocation
Funder, EquityEQT

Who uses the compute

Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

ArusGrid estimate, building costabout US$164m to US$222m

No figure has been announced. This range is 17 MW of planned IT load times a published benchmark of US$11.37 per watt for Malaysia, plus or minus 15 percent. It covers the building and its mechanical and electrical plant. It excludes land, grid works, servers and fees.

Benchmark: Turner & Townsend Data Centre Construction Cost Index 2025, as reported by Data Storage Asia. An estimate is never added to any total on the site.

Colocation price per kW of IT load per month

No published price band exists for Malaysia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources checked 2026-10-20

  1. edgeconnex.com
  2. Kuala Lumpur Data Sheet Q1 update (EdgeConneX, 2026-03-01)
  3. Data Centers in Malaysia (EdgeConneX)

More in Klang Valley

Also run by EdgeConneX

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.