EdgeConneX / Aboitiz InfraCapital MNL01 is a data center project in Metro Manila (site not disclosed), Philippines, operated by EdgeConneX / Aboitiz InfraCapital JV. It is on hold. It is planned for 5 MW of IT load.
Record last checked against its sources on 18 October 2026.
Next gate to watch: Land secured.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How Philippines approves, powers and taxes data centers is on Data center rules in Philippines.
Greater Manila holds 9 active projects with 517 MW of planned IT load between them, and EdgeConneX / Aboitiz InfraCapital MNL01 ranks 9th by planned capacity. Of those, 6 are operational, 1 is at the land and permitting stage, 1 is announced only and 1 is on hold. Published colocation vacancy in Greater Manila was 43.6% as of June 2026, on 90 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.
EdgeConneX has 5 projects elsewhere in the dataset tracked by ArusGrid, including EdgeConneX Jakarta campus (JKT01+), Cikarang, EdgeConneX Cyberjaya Campus and EdgeConneX Johor. It sits on the EdgeConneX Manila campus. Named funding comes from EQT on the equity side and EdgeConneX and Aboitiz InfraCapital. No user of the capacity is on the public record as of 2026-10-02, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.
Grid power for a large industrial user in the Philippines costs about US$0.12 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in the Philippines, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 5 public sources for this project, the latest dated 12 October 2026, and last checked the record on 18 October 2026.
The announcement stands alone, or the project is on hold. The rules are fixed and published on the Methodology page.
No public signal either way.
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
Checked on 2026-10-02. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.
Platform capital spans several sites. It is never added to this project's own figure.
No published price band exists for Philippines, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.
All projects in Greater Manila · All projects in Philippines · All EdgeConneX projects · All projects on hold · Data center rules in Philippines · Full directory