EdgeConneX Bukit Jalil data center

Bukit Jalil, Kuala Lumpur, Malaysia · Klang Valley market · location approximate to district level

EdgeConneX Bukit Jalil is a data center project in Bukit Jalil, Malaysia, operated by EdgeConneX. It is under construction. It is planned for 67 MW of IT load.

Record last checked against its sources on 22 October 2026.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
67 MW
Running now
Not disclosed
Operators rarely publish this
Operator
EdgeConneX
Colocation
AI workloads
No signal either way
Evidence grade
Corroborated
Will it get built?Leaning yes5 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed○ Tenant or own use○ Builder appointed✓ Construction started

Next gate to watch: Tenant or own use.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Malaysia approves, powers and taxes data centers is on Data center rules in Malaysia.

Where it sits

Klang Valley holds 33 active projects with 1,911 MW of planned IT load between them, and EdgeConneX Bukit Jalil ranks 7th by planned capacity. Of those, 5 are operational, 5 are operational and expanding, 10 are under construction, 7 are at the land and permitting stage and 6 are announced only. No third party publishes a colocation vacancy rate for Klang Valley, and ArusGrid does not estimate one.

EdgeConneX has 3 others in Malaysia and 2 projects elsewhere in the dataset tracked by ArusGrid, including EdgeConneX Cyberjaya Campus, EdgeConneX Johor and EdgeConneX KL CBD. It sits on the MRANTI Park Bukit Jalil alongside Bridge Data Centres MY03. Named funding comes from EQT on the equity side. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The build is phased. Initial at 22 MW is under construction with a 2026 target; Full build at 67 MW is announced.

Grid power for a large industrial user in Malaysia costs about US$0.14 per kWh as of July 2025, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Malaysia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 4 public sources for this project, the latest dated March 2026, and last checked the record on 22 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusNo signal either way

no cooling/density/tenant signal published

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

Initial · Under construction22 MW, target 2026
Full build · Announced67 MW

Who is behind it

OperatorEdgeConneX · Colocation
Funder, EquityEQT

Who uses the compute

Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

ArusGrid estimate, building costabout US$648m to US$876m

No figure has been announced. This range is 67 MW of planned IT load times a published benchmark of US$11.37 per watt for Malaysia, plus or minus 15 percent. It covers the building and its mechanical and electrical plant. It excludes land, grid works, servers and fees.

Benchmark: Turner & Townsend Data Centre Construction Cost Index 2025, as reported by Data Storage Asia. An estimate is never added to any total on the site.

Platform deals that include it

EdgeConneX Malaysia program
Country programme, 2023-09
US$2.0bn

Platform capital spans several sites. It is never added to this project's own figure.

Colocation price per kW of IT load per month

No published price band exists for Malaysia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Land
Industrial estateMRANTI Park · Sep 2023 Confirmed source ↗
Greenfield build in MRANTI Park. MRANTI not named as landlord.
Power supply
Dedicated substation132kV · Mar 2026 Confirmed source ↗
132kV substation; 22.4MW growing to 67MW · Applies to the whole campus.
Water and cooling
CoolingWater-cooled chillers Confirmed source ↗
N+1 chilled water with N+1 fan wall or CRAH units.
Possibly linked
The source does not name the project, and more than one project we track fits. We show it on each of them and pin it to none.
UnconfirmedJati Tinggi Holding Sdn Bhd · Grid and substation works · RM6.59m (≈US$2m) · Sep 2024 source ↗
This project is one of 3 that fit. The others are Bridge Data Centres MY03, MRCB / Perintis Akal AI Data Centre (Bukit Jalil).

Sources checked 2026-10-22

  1. edgeconnex.com
  2. datacentermap.com
  3. EdgeConneX Enters the Malaysia Market with Plans for Several Data Centers in Three Markets Offering Nearly 300 MWs of Capacity (MRANTI (EdgeConneX release), 2023-09-11)
  4. Kuala Lumpur Data Sheet Q1 update (EdgeConneX, 2026-03)

Same campus, MRANTI Park Bukit Jalil

More in Klang Valley

Also run by EdgeConneX

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.