Directory › Malaysia › Klang Valley › Nexus Yang Green Data Centre Campus

Nexus Yang Green Data Centre Campus

Seremban (NSSV Industrial Park), Negeri Sembilan, Malaysia · Klang Valley market · location approximate to district level

Also listed as Nexus Yang Green Data Center (NYSB GDC) Senawang, Nexus Yang Senawang and NYSB GDC.

Nexus Yang Green Data Centre Campus is a data center project in Seremban (NSSV Industrial Park), Malaysia, operated by Vena Nexus (Vena Group). It is under construction. It is planned for 350 MW of IT load.

Latest change on record: moved to under construction on 5 February 2026. Record last checked against its sources on 22 October 2026.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
350 MW
Running now
Not disclosed
Operators rarely publish this
Operator
Vena Nexus (Vena Group)
Colocation
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Leaning yes4 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted○ Money committed○ Tenant or own use○ Builder appointed✓ Construction started

Next gate to watch: Money committed.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Malaysia approves, powers and taxes data centers is on Data center rules in Malaysia.

Where it sits

Klang Valley holds 33 active projects with 1,911 MW of planned IT load between them, and Nexus Yang Green Data Centre Campus ranks second by planned capacity. Of those, 5 are operational, 5 are operational and expanding, 10 are under construction, 7 are at the land and permitting stage and 6 are announced only. No third party publishes a colocation vacancy rate for Klang Valley, and ArusGrid does not estimate one.

It is the only Vena Nexus project ArusGrid tracks. It sits on the NS Semiconductor Valley (Malaysia Vision Valley 2.0) campus. No user of the capacity is on the public record as of 2026-10-03, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The dated record runs from under construction on 26 January 2026 to under construction on 5 February 2026. The money on record is RM20bn (about US$4.9bn) as of January 2026, the announced investment. Power comes from Vena Energy.

Grid power for a large industrial user in Malaysia costs about US$0.14 per kWh as of July 2025, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Malaysia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 5 public sources for this project, the latest dated 8 October 2026, and last checked the record on 22 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderNo
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

350MW greenfield campus marketed as AI-ready for cloud providers and hyperscalers.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Stage history

2026-01-26Under construction · bernama.com
2026-02-05Under construction · datacenterdynamics.com

Who is behind it

OperatorVena Nexus (Vena Group) · Colocation

Who uses the compute

Checked on 2026-10-03. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

Announced investment, 2026-01RM20bn (about US$4.9bn)

The figure covers the whole campus.

Colocation price per kW of IT load per month

No published price band exists for Malaysia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Land
Industrial estateNS Semiconductor Valley (NSSV) Industrial Park · 157 acres · Jan 2026 Reported source ↗
Campus area within NSSV, Seremban. Landlord not named.
Power supply
Power allocation or planVena Energy · Feb 2026 Confirmed source ↗
Co-located hybrid green power system integrated with sister company Vena Energy. Technology and capacity not stated. · Planned arrangement. No contract terms published. · Applies to the whole campus.
Renewable power dealVena Energy (co-located renewables and storage) plus TNB grid · Feb 2026 Reported source ↗
No substation or kV disclosed; grid utility inferred as the Malaysian grid, not named in source.

Sources checked 2026-10-22

  1. Vena Nexus Ignites Green AI Era in Negeri Sembilan with Groundbreaking of ‘Nexus Yang’ (Vena Group, 2026-02-04)
  2. Vena Nexus breaks ground on Nexus Yang – powering Malaysia’s green AI future (DCD, 2026-02-06)
  3. Negeri Sembilan Has Potential As Major Data, Technology Hub With Construction Of Green Data Centre Campus (Bernama, 2026-01-26)
  4. Negri Sembilan primed for next phase of growth (The Star, 2026-10-08)
  5. Negeri Sembilan Emerging As Important Industrial Hub But Competition Lurks (Business Today, 2026-10-07)

More in Klang Valley

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.