Also listed as Nexus Yang Green Data Center (NYSB GDC) Senawang, Nexus Yang Senawang and NYSB GDC.
Nexus Yang Green Data Centre Campus is a data center project in Seremban (NSSV Industrial Park), Malaysia, operated by Vena Nexus (Vena Group). It is under construction. It is planned for 350 MW of IT load.
Latest change on record: moved to under construction on 5 February 2026. Record last checked against its sources on 22 October 2026.
Next gate to watch: Money committed.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How Malaysia approves, powers and taxes data centers is on Data center rules in Malaysia.
Klang Valley holds 33 active projects with 1,911 MW of planned IT load between them, and Nexus Yang Green Data Centre Campus ranks second by planned capacity. Of those, 5 are operational, 5 are operational and expanding, 10 are under construction, 7 are at the land and permitting stage and 6 are announced only. No third party publishes a colocation vacancy rate for Klang Valley, and ArusGrid does not estimate one.
It is the only Vena Nexus project ArusGrid tracks. It sits on the NS Semiconductor Valley (Malaysia Vision Valley 2.0) campus. No user of the capacity is on the public record as of 2026-10-03, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.
The dated record runs from under construction on 26 January 2026 to under construction on 5 February 2026. The money on record is RM20bn (about US$4.9bn) as of January 2026, the announced investment. Power comes from Vena Energy.
Grid power for a large industrial user in Malaysia costs about US$0.14 per kWh as of July 2025, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Malaysia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 5 public sources for this project, the latest dated 8 October 2026, and last checked the record on 22 October 2026.
Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.
Reaching this stage requires a dated construction source, which corroborates the project on its own.
350MW greenfield campus marketed as AI-ready for cloud providers and hyperscalers.
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
Checked on 2026-10-03. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.
The figure covers the whole campus.
No published price band exists for Malaysia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.