Also listed as Vantage KUL 2 Cyberjaya and Vantage KUL02.
Vantage KUL2 is a data center project in Cyberjaya, Malaysia, operated by Vantage Data Centers. It is under construction. It is planned for 436 MW of IT load.
Latest change on record: entered the record as under construction on 7 August 2024. Record last checked against its sources on 20 October 2026.
Next gate to watch: Tenant or own use.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How Malaysia approves, powers and taxes data centers is on Data center rules in Malaysia.
Klang Valley holds 33 active projects with 1,911 MW of planned IT load between them, and Vantage KUL2 ranks first by planned capacity. Of those, 5 are operational, 5 are operational and expanding, 10 are under construction, 7 are at the land and permitting stage and 6 are announced only. No third party publishes a colocation vacancy rate for Klang Valley, and ArusGrid does not estimate one.
Vantage Data Centers has 2 others in Malaysia tracked by ArusGrid, including Vantage JHB1 (ex-Yondr) and Vantage KUL1. It sits on the Cyberjaya II campus. Named funding comes from DigitalBridge on the equity side. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.
The build is phased. Building 1 is under construction with a 2025 target; Full campus (6 data centres) at 436 MW is announced. The stage was recorded as under construction on 7 August 2024. The money on record is US$3bn as of May 2023, the announced investment. Power comes from TNB through a dedicated substation at 275 kV.
Grid power for a large industrial user in Malaysia costs about US$0.14 per kWh as of July 2025, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Malaysia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 6 public sources for this project, the latest dated 29 July 2026, and last checked the record on 20 October 2026.
Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.
Reaching this stage requires a dated construction source, which corroborates the project on its own.
256MW modern greenfield ($3bn)
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.
The figure covers the whole campus.
No published price band exists for Malaysia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.
All projects in Klang Valley · All projects in Malaysia · All Vantage Data Centers projects · All projects under construction · Data center rules in Malaysia · Full directory