Vantage JHB1 (ex-Yondr) data center

Sedenak (Kulai), Johor, Malaysia · Johor market · location approximate to district level

Also listed as JHB1 and Yondr JHB1.

Vantage JHB1 (ex-Yondr) is a data center project in Sedenak (Kulai), Malaysia, operated by Vantage Data Centers (acquired from Yondr Group). It is operational and expanding. It is planned for 300 MW of IT load. The operator reports 25 MW running.

Latest change on record: entered the record as expanding on 6 June 2025. Record last checked against its sources on 21 October 2026.

Open on the mapSuggest a correction
Stage
Expanding
Planned IT load
300 MW
Running now
25 MW
Operators rarely publish this
Operator
Vantage Data Centers (acquired from Yondr Group)
Colocation
AI workloads
Confirmed
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Malaysia approves, powers and taxes data centers is on Data center rules in Malaysia.

Where it sits

Johor holds 43 active projects with 4,880 MW of planned IT load between them, and Vantage JHB1 (ex-Yondr) ranks 5th by planned capacity. Of those, 3 are operational, 9 are operational and expanding, 11 are under construction, 1 is past financial close, 5 are at the land and permitting stage and 14 are announced only. Published colocation vacancy in Johor was 0.7% as of June 2026, on 897 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

Vantage Data Centers has 2 others in Malaysia tracked by ArusGrid, including Vantage KUL2 and Vantage KUL1. It sits on the Vantage Sedenak Campus. Named funding comes from GIC and ADIA on the equity side. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The build is phased. DC1 first completion at 25 MW is operational with a 2025 target; DC1 full (98MW) at 98 MW is under construction; Full campus (3 DCs) at 300 MW is announced. The stage was recorded as operational and expanding on 6 June 2025. The money on record is US$900m as of September 2024, debt raised, which ArusGrid keeps out of capital totals. Power comes from Tenaga Nasional Berhad (TNB) through grid supply at 275 kV. Cooling uses direct liquid cooling.

Grid power for a large industrial user in Malaysia costs about US$0.14 per kWh as of July 2025, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Malaysia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 9 public sources for this project, the latest dated 29 July 2026, and last checked the record on 21 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusConfirmed

AI/ML design with direct-to-chip liquid cooling (operator)

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

DC1 first completion · Operational25 MW, target 2025
DC1 full (98MW) · Under construction98 MW
Full campus (3 DCs) · Announced300 MW

Stage history

2025-06-06Expanding · datacenterdynamics.com

Who is behind it

OperatorVantage Data Centers (acquired from Yondr Group) · Colocation
Funder, EquityGIC
Funder, EquityADIA
Funder, DebtGreen loan syndicate (US$900m+)

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Money at this site

Debt raised, 2024-09US$900m

This is the size of a loan. ArusGrid excludes it from capital spending totals.

The figure covers the whole campus.

Platform deals that include it

Vantage APAC raise + Yondr Johor acquisition
Platform acquisition, 2025-11
US$1.6bn

Platform capital spans several sites. It is never added to this project's own figure.

Colocation price per kW of IT load per month

No published price band exists for Malaysia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Project team
Project managerHSS Integrated Sdn Bhd · RM8.8m (≈US$2m) · Jan 2023 Reported source ↗
Project control, planning, construction management, H&S for DC campus and substation, 18 months
Project managerHSS Engineers Sdn Bhd · RM10.2m (≈US$2m) · Aug 2024 Reported source ↗
Project construction management services, 22 months to Jun 2026
Design and build contractorSunway Construction Sdn Bhd · RM1.7bn (≈US$383m) · Dec 2022 Reported source ↗
Project JHB1X0 design and build: piling, precast structure, architecture, M&E, ancillary works
Design and build contractorSunway Construction Sdn Bhd · RM1.5bn (≈US$338m) · Jun 2024 Reported source ↗
JHB1X0 additional NTP4 works (fourth phase); contract raised to RM3.2bn
Fit-out contractorSunway Construction Sdn Bhd · RM82m (≈US$18m) · Sep 2024 Reported source ↗
JHB1X0 tenant improvement works, variation order 1
Fit-out contractorSunway Construction Sdn Bhd · RM265m (≈US$60m) · Oct 2024 Reported source ↗
JHB1X0 tenant improvement works incl. VOs (cumulative TIW RM347m; contract to RM3.5bn, complete Feb 2026)
Land
Land sellerTPM Technopark Sdn Bhd (Johor Corporation) · 72.8 acres · Mar 2022 Confirmed source ↗
"72.8 acres of land acquired from TPM Technopark" in Sedenak Tech Park; buyer Yondr (campus later acquired by Vantage)
Power supply
Grid supplyTenaga Nasional Berhad (TNB) · 275kV Confirmed source ↗
Dual 275kV primary feeds; multiple diverse 33kV secondary feeds per building; air-cooled chillers · Applies to the whole campus.
Water and cooling
CoolingDirect liquid cooling Confirmed source ↗
Release lists direct-to-chip liquid cooling among campus technologies; campus on track for EDGE certification
CoolingHybrid air and liquid cooling Confirmed source ↗
Vantage lists air-cooled chillers, hybrid liquid and air cooled GPU cluster deployments and liquid cooling readiness, with N+2 mechanical redundancy. The campus is targeting EDGE certification. No PUE or WUE figure is given. Power is dual 275kV TNB feeds with several 33kV feeds per building.

Sources checked 2026-10-21

  1. vantage-dc.com
  2. yondrgroup.com
  3. datacenterdynamics.com
  4. Vantage explores $2bn-plus sale of Malaysian data centre assets – report (Investment Monitor, 2026-07-29)
  5. Vantage mulls selling its US$ 2 billion data centers in Malaysia: Bloomberg (W.Media, 2026-07-29)
  6. Yondr Group hands over Johor data center ahead of schedule (DCD, 2025-06-06)
  7. Vantage Data Centers Completes $1.6B Investment in APAC Platform from GIC and ADIA; Closes Acquisition of Yondr's 300MW Hyperscale Campus in Johor, Malaysia (Business Wire (Vantage Data Centers), 2025-11-23)
  8. Analysts see more data centre wins for Sunway Construction as JHB1X0 project nears completion (The Edge Malaysia, 2026-05-19)
  9. Johor (JHB1) Data Center Campus (Vantage Data Centers, 2026-05-27)

More in Johor

Also run by Vantage Data Centers

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.