Empyrion Digital MY1 data center

Iskandar Puteri (Gelang Patah), Johor, Malaysia · Johor market · location approximate to district level

Empyrion Digital MY1 is a data center project in Iskandar Puteri (Gelang Patah), Malaysia, operated by Empyrion Digital. It is under construction. It is planned for 200 MW of IT load.

Record last checked against its sources on 21 October 2026.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
200 MW
Running now
Not disclosed
Operators rarely publish this
Operator
Empyrion Digital
Colocation
AI workloads
Confirmed
Evidence grade
Corroborated
Will it get built?Leaning yes5 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed○ Tenant or own use○ Builder appointed✓ Construction started

Next gate to watch: Tenant or own use.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Malaysia approves, powers and taxes data centers is on Data center rules in Malaysia.

Where it sits

Johor holds 43 active projects with 4,880 MW of planned IT load between them, and Empyrion Digital MY1 ranks 10th by planned capacity. Of those, 3 are operational, 9 are operational and expanding, 11 are under construction, 1 is past financial close, 5 are at the land and permitting stage and 14 are announced only. Published colocation vacancy in Johor was 0.7% as of June 2026, on 897 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

Empyrion Digital has 1 project elsewhere in the dataset tracked by ArusGrid, including Empyrion Digital TH1 Bangkok. It sits on the Empyrion MY1 (i-TechValley) campus. Named funding comes from SeaTown Holdings (Temasek unit) on the equity side. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

Power comes from Tenaga Nasional Berhad (TNB) through grid supply. Cooling uses hybrid air and liquid cooling.

Grid power for a large industrial user in Malaysia costs about US$0.14 per kWh as of July 2025, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Malaysia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 7 public sources for this project, the latest dated 10 August 2026, and last checked the record on 21 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusConfirmed

next-gen hyperscale AI design per operator

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

Bldg 1 of 5 (40MW each) · Under construction40 MW, target Q1 2027

Who is behind it

OperatorEmpyrion Digital · Colocation
Funder, EquitySeaTown Holdings (Temasek unit)

Who uses the compute

Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

ArusGrid estimate, building costabout US$1.9bn to US$2.9bn

No figure has been announced. This range is 200 MW of planned IT load times a published benchmark of US$11.37 per watt for Malaysia, plus or minus 15 percent, with 10 percent more at the top for liquid cooling because the project is AI-positioned. It covers the building and its mechanical and electrical plant. It excludes land, grid works, servers and fees.

Benchmark: Turner & Townsend Data Centre Construction Cost Index 2025, as reported by Data Storage Asia. An estimate is never added to any total on the site.

Colocation price per kW of IT load per month

No published price band exists for Malaysia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Land
Industrial estateSiLC Industrial Cluster, Nusajaya (estate operator not named in source) · 34.9 acres · Dec 2025 Confirmed source ↗
Site area only. Seller and tenure not disclosed.
Industrial estateSiLC Industrial Cluster, Nusajaya (estate; operator not named) · 34.9 acres · Dec 2025 Confirmed source ↗
Power supply
Grid supplyTenaga Nasional Berhad (TNB) · 145 MW · Dec 2025 Confirmed source ↗
Long-term green PPAs mentioned, no counterparty · Initial 145MW allocation, energisation from Sep 2026 · Applies to the whole campus.
Grid supplyTenaga Nasional Berhad · 145 MW · Dec 2025 Confirmed source ↗
To be supplemented by other green energy providers via MOUs per w.media 2026-08-10. · Initial power allocation. Earliest energisation targeted September 2026. · Applies to the whole campus.
Water and cooling
CoolingHybrid air and liquid cooling · design PUE <1.3 (liquid) / <1.4 (air) Reported source ↗
Liquid and air-cooled halls; PUE target <1.3 liquid, <1.4 air
CoolingHybrid air and liquid cooling · design PUE 1.3 Confirmed source ↗
Liquid-cooled and air-cooled technologies.
Possibly linked
The source does not name the project, and more than one project we track fits. We show it on each of them and pin it to none.
UnconfirmedWest River Bhd · Grid and substation works · RM22.56m (≈US$5m) · Aug 2026 source ↗
This project is one of 3 that fit. The others are STACK JHB01, Digital Hyperspace Johor.

Sources checked 2026-10-21

  1. empyriondigital.com
  2. datacentermap.com
  3. Empyrion Digital tops out Phase 1 of maiden data center in Johor (W.Media, 2026-08-10)
  4. Empyrion tops out upcoming Malaysian data center in Johor (DatacenterDynamics, 2026-08-07)
  5. Empyrion Digital launches 200MW data center in Johor (W.Media, 2025-12-09)
  6. Singapore firm Empyrion Digital gets regulatory nod to build 200MW hyperscale data centre in Johor (The Edge Malaysia, 2025-12-09)
  7. Empyrion Digital Unveils Johor's Newest Large-scale Next-Generation Hyperscale Data Centre Campus (Kosmo Online (PR Newswire), 2025-12-09)

More in Johor

Also run by Empyrion Digital

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.