NTT GDC Cyberjaya Campus (CBJ1-CBJ6)

Cyberjaya, Selangor, Malaysia · Klang Valley market · location approximate to city level

NTT GDC Cyberjaya Campus (CBJ1-CBJ6) is a data center project in Cyberjaya, Malaysia, operated by NTT Global Data Centers. It is operational. The only published capacity figure is 22 MW of total facility power. IT load will be lower.

Latest change on record: moved to operational on 10 October 2023. Record last checked against its sources on 21 October 2026.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
22 MW
Total facility power
Running now
Not disclosed
Operators rarely publish this
Operator
NTT Global Data Centers
Telco
AI workloads
No signal either way
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Malaysia approves, powers and taxes data centers is on Data center rules in Malaysia.

Where it sits

Klang Valley holds 33 active projects with 1,911 MW of planned IT load between them, and NTT GDC Cyberjaya Campus (CBJ1-CBJ6) ranks 13th by planned capacity. Of those, 5 are operational, 5 are operational and expanding, 10 are under construction, 7 are at the land and permitting stage and 6 are announced only. No third party publishes a colocation vacancy rate for Klang Valley, and ArusGrid does not estimate one.

NTT GDC has 1 other in Malaysia and 4 projects elsewhere in the dataset tracked by ArusGrid, including NTT Johor Bahru Campus. It sits on the NTT Cyberjaya campus. Named funding comes from NTT on the equity side. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The build is phased. CBJ5 at 12 MW is operational with a 2021 target; CBJ6 at 7 MW is operational with a 2023 target. The dated record runs from under construction on 5 September 2022 to operational on 10 October 2023. Power comes from Not named through a dedicated substation at 33 kV (reported, unconfirmed). Cooling uses air cooling.

Grid power for a large industrial user in Malaysia costs about US$0.14 per kWh as of July 2025, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Malaysia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 6 public sources for this project, the latest dated 17 October 2023, and last checked the record on 21 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsNo

AI workloads

StatusNo signal either way

no cooling/density/tenant signal published

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

CBJ5 · Operational12 MW, target 2021
CBJ6 · Operational7 MW, target 2023

Stage history

2022-09-05Under construction · mida.gov.my
2023-10-10Operational · w.media

Who is behind it

OperatorNTT Global Data Centers · Telco
Funder, EquityNTT

Who uses the compute

Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Colocation price per kW of IT load per month

No published price band exists for Malaysia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Power supply
Dedicated substationNot named · 33kV · Oct 2023 Reported source ↗
CBJ6 has two 33kV substations with diverse power reception. The utility is not named. Applies to CBJ6, not the whole campus.
Water and cooling
CoolingAir cooled Reported source ↗
Cyberjaya 6 building: cooling wall (fan wall) technology, racks up to 15kW

Sources checked 2026-10-21

  1. mida.gov.my
  2. services.global.ntt
  3. NTT opens new facility in Malaysia (Data Centre Review, 2023-10-17)
  4. NTT Cyberjaya 6 data center launch supports digital transformation in Malaysia (W.Media, 2023-10-10)
  5. NTT commences construction of sixth data centre in Cyberjaya (MIDA, 2022-09-06)
  6. NTT Launches Its Sixth RM234 Million Data Centre In Cyberjaya (MRANTI (Business Today), 2023-10-10)

More in Klang Valley

Also run by NTT GDC

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.