NTT GDC Cyberjaya Campus (CBJ1-CBJ6) is a data center project in Cyberjaya, Malaysia, operated by NTT Global Data Centers. It is operational. The only published capacity figure is 22 MW of total facility power. IT load will be lower.
Latest change on record: moved to operational on 10 October 2023. Record last checked against its sources on 21 October 2026.
This project is built or running, so every gate counts as passed.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How Malaysia approves, powers and taxes data centers is on Data center rules in Malaysia.
Klang Valley holds 33 active projects with 1,911 MW of planned IT load between them, and NTT GDC Cyberjaya Campus (CBJ1-CBJ6) ranks 13th by planned capacity. Of those, 5 are operational, 5 are operational and expanding, 10 are under construction, 7 are at the land and permitting stage and 6 are announced only. No third party publishes a colocation vacancy rate for Klang Valley, and ArusGrid does not estimate one.
NTT GDC has 1 other in Malaysia and 4 projects elsewhere in the dataset tracked by ArusGrid, including NTT Johor Bahru Campus. It sits on the NTT Cyberjaya campus. Named funding comes from NTT on the equity side. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.
The build is phased. CBJ5 at 12 MW is operational with a 2021 target; CBJ6 at 7 MW is operational with a 2023 target. The dated record runs from under construction on 5 September 2022 to operational on 10 October 2023. Power comes from Not named through a dedicated substation at 33 kV (reported, unconfirmed). Cooling uses air cooling.
Grid power for a large industrial user in Malaysia costs about US$0.14 per kWh as of July 2025, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Malaysia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 6 public sources for this project, the latest dated 17 October 2023, and last checked the record on 21 October 2026.
Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.
no cooling/density/tenant signal published
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.
No published price band exists for Malaysia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.
All projects in Klang Valley · All projects in Malaysia · All NTT GDC projects · All projects operational · Data center rules in Malaysia · Full directory