ArusGridProject
Directory › Thailand › EEC (Eastern Seaboard) › NTT Bangkok 4 (BKK4), Amata City Chonburi

NTT Bangkok 4 (BKK4), Amata City Chonburi data center

Amata City Chonburi Industrial Estate, Chonburi, Thailand · EEC (Eastern Seaboard) market · location approximate to district level

NTT Bangkok 4 (BKK4), Amata City Chonburi is a data center project in Amata City Chonburi Industrial Estate, Thailand, operated by NTT Global Data Centers. It is under construction. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Record last checked against its sources on 22 October 2026.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
NTT Global Data Centers
Colocation
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Leaning yes4 of 7 gates passed
✓ Land secured○ Power arranged✓ Approvals granted✓ Money committed○ Tenant or own use○ Builder appointed✓ Construction started

Next gate to watch: Power arranged.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Thailand approves, powers and taxes data centers is on Data center rules in Thailand.

Thailand, 2026-09-24. Thailand asked developers on 4 September 2026 to pause 49 data centres under construction and froze 117 pending approvals while it writes new rules, due by mid October. The government has said it cannot legally enforce the pause. No list of affected projects has been published, so no Thai project has changed stage on this basis. A separate data centre electricity tariff has been created with no rate set.

Where it sits

EEC (Eastern Seaboard) holds 21 active projects with 3,703 MW of planned IT load between them, and NTT Bangkok 4 (BKK4), Amata City Chonburi has no published figure so it sits outside that ranking. Of those, 2 are operational, 1 is operational and expanding, 9 are under construction, 7 are at the land and permitting stage and 2 are announced only. No third party publishes a colocation vacancy rate for EEC (Eastern Seaboard), and ArusGrid does not estimate one.

NTT GDC has 2 others in Thailand and 3 projects elsewhere in the dataset tracked by ArusGrid, including NTT Bangkok 2 & 3 (Amata City Chonburi) and NTT Bangkok 5 (BKK5), Chonburi. It sits on the NTT Amata City Chonburi campus alongside NTT Bangkok 2 & 3 (Amata City Chonburi) and NTT Bangkok 5 (BKK5), Chonburi. Named funding comes from NTT on the equity side. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

Power comes from Amata B.Grimm Power (B.Grimm Power PCL).

Grid power for a large industrial user in Thailand costs about US$0.10 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Thailand, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 4 public sources for this project, the latest dated 15 July 2026, and last checked the record on 22 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

100MW of contracted power for a single new building, 2026-27 vintage, from an operator whose current builds are liquid-cooling-ready. No cooling/density spec published for BKK4 specifically.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Who is behind it

OperatorNTT Global Data Centers · Colocation
Funder, EquityNTT

Who uses the compute

Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Colocation price per kW of IT load per month

No published price band exists for Thailand, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Power supply
Power allocation or planAmata B.Grimm Power (B.Grimm Power PCL) · 100 MW · Jan 2026 Confirmed source ↗
Fuel source not stated. · 100MW power purchase agreement from an estate power producer in Amata City Chonburi. COD scheduled June 2027.
Possibly linked
The source does not name the project, and more than one project we track fits. We show it on each of them and pin it to none.
UnconfirmedFuji Electric Thailand · Grid and substation works · Jul 2026 source ↗
This project is one of 2 that fit. The other is NTT Bangkok 5 (BKK5), Chonburi.

Sources checked 2026-10-22

  1. bgrimmpower.com
  2. datacenterdynamics.com
  3. NTT GDC & Fuji Electric break ground on NTT's new data center substation in Thailand (W.Media, 2026-07-15)
  4. NTT breaks ground on campus in Chonburi, Thailand (DatacenterDynamics, 2026-07-13)

Same campus, NTT Amata City Chonburi

More in EEC (Eastern Seaboard)

Also run by NTT GDC

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.