Directory › Thailand › EEC (Eastern Seaboard) › Gulf Edge Data Center 01 (GEDC01, ex-GSA03), Rayong, plus GSA Data Center 05 Samut Prakan

Gulf Edge Data Center 01 (GEDC01, ex-GSA03), Rayong, plus GSA Data Center 05 Samut Prakan

Pluak Daeng (WHA Eastern Seaboard IE 5), Rayong, Thailand · EEC (Eastern Seaboard) market · location approximate to district level

Gulf Edge Data Center 01 (GEDC01, ex-GSA03), Rayong, plus GSA Data Center 05 Samut Prakan is a data center project in Pluak Daeng (WHA Eastern Seaboard IE 5), Thailand, operated by Gulf Edge Data Center 01 (Gulf Edge / AIS DC Venture). It is under construction. It is planned for 120 MW of IT load.

Latest change on record: entered the record as under construction on 8 May 2026. Record last checked against its sources on 22 October 2026.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
120 MW
Running now
Not disclosed
Operators rarely publish this
Operator
Gulf Edge Data Center 01 (Gulf Edge / AIS DC Venture)
Joint venture
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Leaning yes4 of 7 gates passed
✓ Land secured○ Power arranged✓ Approvals granted✓ Money committed○ Tenant or own use○ Builder appointed✓ Construction started

Next gate to watch: Power arranged.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Thailand approves, powers and taxes data centers is on Data center rules in Thailand.

Thailand, 2026-09-24. Thailand asked developers on 4 September 2026 to pause 49 data centres under construction and froze 117 pending approvals while it writes new rules, due by mid October. The government has said it cannot legally enforce the pause. No list of affected projects has been published, so no Thai project has changed stage on this basis. A separate data centre electricity tariff has been created with no rate set.

Where it sits

EEC (Eastern Seaboard) holds 21 active projects with 3,703 MW of planned IT load between them, and Gulf Edge Data Center 01 (GEDC01, ex-GSA03), Rayong, plus GSA Data Center 05 Samut Prakan ranks 10th by planned capacity. Of those, 2 are operational, 1 is operational and expanding, 9 are under construction, 7 are at the land and permitting stage and 2 are announced only. No third party publishes a colocation vacancy rate for EEC (Eastern Seaboard), and ArusGrid does not estimate one.

GSA (Gulf/Singtel/AIS) has 2 others in Thailand tracked by ArusGrid, including GSA Data Center Chonburi and GSA Data Center 1 (Bang Phli). It sits on the GSA 05 campus. Named funding comes from Gulf Development, Singtel and Advanced Info Service (AIS). No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The stage was recorded as under construction on 8 May 2026. The money on record is THB 37.2bn (about US$1.2bn) as of January 2026, a government approval ceiling.

Grid power for a large industrial user in Thailand costs about US$0.10 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Thailand, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 12 public sources for this project, the latest dated 14 October 2026, and last checked the record on 22 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderYes
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

100MW greenfield EEC campus by the GSA platform, which markets liquid cooling and AI-ready infrastructure on GSA01 (Gulf, 2026-06-10). Design intent, no deployed-GPU source.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

GEDC01 Rayong (ex-GSA03) · Under construction100 MW, target 2027

Stage history

2026-05-08Under construction · kaohooninternational.com

Who is behind it

OperatorGulf Edge Data Center 01 (Gulf Edge / AIS DC Venture) · Joint venture
Funder, Joint venture partnerGulf Development
Funder, Joint venture partnerSingtel
Funder, Joint venture partnerAdvanced Info Service (AIS)

Who uses the compute

Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

Approved by a government investment agency, 2026-01THB 37.2bn (about US$1.2bn)

An approval figure is an incentive ceiling. It often covers a first phase and can exclude land or IT equipment.

The figure covers several facilities.

Colocation price per kW of IT load per month

No published price band exists for Thailand, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources checked 2026-10-22

  1. thestorythailand.com
  2. w.media
  3. datacenterdynamics.com
  4. GULF Acquires 70% Shareholding in GSA Data Center 03, Bolstering Strategic Position in Digital Transformation (Kaohoon International, 2026-01-09)
  5. GULF Establishes New Entity to Strengthen Data Center and Digital Business (Kaohoon International, 2026-05-08)
  6. GULF Gears Up Digital Expansion With Two New Thailand Data Center Subsidiaries (Kaohoon International, 2026-07-24)
  7. GULF's core profit surged 74% YoY to a record high of THB 12,332 million in Q2/2026, driven by the energy business and share of profit from AIS (Gulf Development, 2026-08-06)
  8. GULF Shares Vision at Earth Jump Forum, Driving Thailand to Become Regional Data Center & AI Hub (Gulf Development, 2026-06-10)
  9. GULF เสริมทัพธุรกิจดิจิทัล ตั้ง 2 บริษัทใหม่ลุย Data Center เต็มสูบ (Thansettakij, 2026-07-24)
  10. GULF Gears Up Digital Expansion With Two New Thailand Data Center Subsidiaries (Kaohoon International, 2026-07-24)
  11. BOI press release No. 8/2569 (Thailand Board of Investment, 2026-01-15)
  12. Thailand's Gulf sets up new data center-focused holding company (DCD, 2026-10-14)

More in EEC (Eastern Seaboard)

Also run by GSA (Gulf/Singtel/AIS)

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.