ArusGridProject
Directory › Philippines › Greater Manila › YCO Cloud Campus One (Malvar One / M1)

YCO Cloud Campus One (Malvar One / M1)

Malvar, Batangas, Philippines · Greater Manila market · location approximate to district level

YCO Cloud Campus One (Malvar One / M1) is a data center project in Malvar, Philippines, operated by YCO Cloud Centers. It is operational. It is planned for 12 MW of IT load. The operator reports 12 MW running.

Record last checked against its sources on 18 October 2026.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
12 MW
Running now
12 MW
Operators rarely publish this
Operator
YCO Cloud Centers
Colocation
AI workloads
No signal either way
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Philippines approves, powers and taxes data centers is on Data center rules in Philippines.

Where it sits

Greater Manila holds 9 active projects with 517 MW of planned IT load between them, and YCO Cloud Campus One (Malvar One / M1) ranks 8th by planned capacity. Of those, 6 are operational, 1 is at the land and permitting stage, 1 is announced only and 1 is on hold. Published colocation vacancy in Greater Manila was 43.6% as of June 2026, on 90 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

It is the only YCO Cloud project ArusGrid tracks. It sits on the YCO Cloud Campus One. Named funding comes from JJYnchausti Group and SM Investments Corporation on the equity side and Cloud Centers Inc (US). No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The build is phased. M1 (built) at 12 MW is operational with a 2023 target; Campus expansion at 24 MW is announced. Power comes from Local electricity suppliers (not named) through a renewable power purchase agreement.

Grid power for a large industrial user in the Philippines costs about US$0.12 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in the Philippines, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 8 public sources for this project, the latest dated 4 September 2026, and last checked the record on 18 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusNo signal either way

No public signal either way.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

M1 (built) · Operational12 MW, target 2023
Campus expansion · Announced24 MW

Who is behind it

OperatorYCO Cloud Centers · Colocation
Funder, EquityJJYnchausti Group
Funder, Joint venture partnerCloud Centers Inc (US)
Funder, EquitySM Investments Corporation

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Platform deals that include it

SM Investments exits the data center sector
Platform acquisition
Not disclosed

Platform capital spans several sites. It is never added to this project's own figure.

Colocation price per kW of IT load per month

No published price band exists for Philippines, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Power supply
Renewable power dealLocal electricity suppliers (not named) · May 2026 Confirmed source ↗
IFC says 100 percent of the expected electricity is contracted from renewable sources. · Figure covers the YCO Catalyst project including the planned BTS site. · Covers the operator's wider portfolio in this country, not this site alone.
Water and cooling
Coolingdesign PUE 1.3 Confirmed source ↗
Coolingdesign PUE 1.35 Confirmed source ↗
IFC says limited water is used for cooling at the Malvar sites.

Sources checked 2026-10-18

  1. philstar.com
  2. ycocloud.com
  3. datacenterdynamics.com
  4. w.media
  5. thephilbiznews.com
  6. eco-business.com
  7. IFC approves US$ 170 million financing to Philippines data center firm YCO Cloud (W.Media, 2026-09-04)
  8. YCO Catalyst Environmental and Social Review Summary (International Finance Corporation, 2026-05-08)

More in Greater Manila

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.