ArusGridProject
Directory › Philippines › Greater Manila › The Hive (Beeinfotech PH)

The Hive (Beeinfotech PH) data center

Quezon City (Bridgetowne), Metro Manila, Philippines · Greater Manila market · location approximate to district level

The Hive (Beeinfotech PH) is a data center project in Quezon City (Bridgetowne), Philippines, operated by Bee Information Technology PH (Beeinfotech). It is operational. It is planned for 20 MW of IT load.

Latest change on record: entered the record as operational on 14 February 2022. Record last checked against its sources on 21 October 2026.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
20 MW
Running now
Not disclosed
Operators rarely publish this
Operator
Bee Information Technology PH (Beeinfotech)
Colocation
AI workloads
Likely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Philippines approves, powers and taxes data centers is on Data center rules in Philippines.

Where it sits

Greater Manila holds 9 active projects with 517 MW of planned IT load between them, and The Hive (Beeinfotech PH) ranks 7th by planned capacity. Of those, 6 are operational, 1 is at the land and permitting stage, 1 is announced only and 1 is on hold. Published colocation vacancy in Greater Manila was 43.6% as of June 2026, on 90 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

It is the only Beeinfotech project ArusGrid tracks. It sits on the The Hive campus. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The stage was recorded as operational on 14 February 2022. Power comes from National grid (utility not named) through grid supply (reported, unconfirmed).

Grid power for a large industrial user in the Philippines costs about US$0.12 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in the Philippines, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 8 public sources for this project, the latest dated 21 March 2025, and last checked the record on 21 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Operator states the facility is 'powered by 20MW+ for AI and traditional colocation' and it is provisioned to host AWS Outposts (an on-prem AWS hardware product, NOT an AWS tenancy). Stated AI purpose = 'likely' under the 4-tier rule. No cooling or rack-density spec published.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Stage history

2022-02-14Operational · w.media

Who is behind it

OperatorBee Information Technology PH (Beeinfotech) · Colocation

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Colocation price per kW of IT load per month

No published price band exists for Philippines, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Land
LandlordRobinsons Land Corporation (Bridgetowne Destination Estate) · 19,000 sqm · leased · Jul 2021 Reported source ↗
19,000 sqm leasable space over three storeys plus 1,500 sqm for a power centre. Term not disclosed.
Power supply
Grid supplyNational grid (utility not named) · Mar 2025 Reported source ↗
30 percent of energy sourced from renewables, with a 100 percent target by 2030. · Article cites dual power supplies of between 20 and 22 MW. This is a supply figure, not IT load.

Sources checked 2026-10-21

  1. datacenterdynamics.com
  2. beeinfotech.ph
  3. baxtel.com
  4. datacentermap.com
  5. Beeinfotech announces General Availability of 1st Data Centre in Philippines (W.Media, 2022-02-14)
  6. Data center operator formally opens facility in Pasig City (NewsBytes.PH, 2025-03-21)
  7. BeeInfotech leases land for Philippines' largest data centre (Data Centre Magazine, 2021-07-03)
  8. Beeinfotech PH opens largest telco-neutral data center (BusinessWorld)

More in Greater Manila

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.