AWS Asia Pacific (Hyderabad) region, existing sites is a data center project in Hyderabad, India, operated by Amazon Web Services. It is operational. The operator has not published a capacity figure, and ArusGrid does not estimate one.
Latest change on record: entered the record as operational on 22 November 2022. Record last checked against its sources on 22 October 2026.
This project is built or running, so every gate counts as passed.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How India approves, powers and taxes data centers is on Data center rules in India.
Hyderabad holds 15 active projects with 1,128 MW of planned IT load between them, and AWS Asia Pacific (Hyderabad) region, existing sites has no published figure so it sits outside that ranking. Of those, 5 are operational, 3 are under construction, 3 are at the land and permitting stage and 4 are announced only. Published colocation vacancy in Hyderabad was 23.4% as of June 2025. Vacancy excludes hyperscaler self-build.
AWS has 4 others in India and 7 projects elsewhere in the dataset tracked by ArusGrid, including AWS Thane (Balkum-Majiwada), AWS Bharat Future City campus and AWS Palava. It sits on the AWS Asia Pacific (Hyderabad) campus alongside AWS Bharat Future City campus. No user of the capacity is on the public record as of 2026-10-02, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.
The stage was recorded as operational on 22 November 2022. Power comes from Telangana state discom (the EMP names it TCPDCL) through a dedicated substation.
The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 7 public sources for this project, the latest dated 17 July 2026, and last checked the record on 22 October 2026.
Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.
Hyperscaler self-build region live 2022, AI expansion stated 2026.
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
Built for Amazon Web Services's own use. No customer workload has been tied to this building on the public record.
An own-use build. No colocation price applies.
All projects in Hyderabad · All projects in India · All AWS projects · All projects operational · Data center rules in India · Full directory