ArusGridProject
Directory › India › Hyderabad › AWS Asia Pacific (Hyderabad) region, existing sites

AWS Asia Pacific (Hyderabad) region, existing sites data center

Hyderabad, Telangana, India · Hyderabad market · location approximate to city level

AWS Asia Pacific (Hyderabad) region, existing sites is a data center project in Hyderabad, India, operated by Amazon Web Services. It is operational. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Latest change on record: entered the record as operational on 22 November 2022. Record last checked against its sources on 22 October 2026.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
Amazon Web Services
Hyperscaler self-build
AI workloads
Likely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How India approves, powers and taxes data centers is on Data center rules in India.

Where it sits

Hyderabad holds 15 active projects with 1,128 MW of planned IT load between them, and AWS Asia Pacific (Hyderabad) region, existing sites has no published figure so it sits outside that ranking. Of those, 5 are operational, 3 are under construction, 3 are at the land and permitting stage and 4 are announced only. Published colocation vacancy in Hyderabad was 23.4% as of June 2025. Vacancy excludes hyperscaler self-build.

AWS has 4 others in India and 7 projects elsewhere in the dataset tracked by ArusGrid, including AWS Thane (Balkum-Majiwada), AWS Bharat Future City campus and AWS Palava. It sits on the AWS Asia Pacific (Hyderabad) campus alongside AWS Bharat Future City campus. No user of the capacity is on the public record as of 2026-10-02, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The stage was recorded as operational on 22 November 2022. Power comes from Telangana state discom (the EMP names it TCPDCL) through a dedicated substation.

The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 7 public sources for this project, the latest dated 17 July 2026, and last checked the record on 22 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Hyperscaler self-build region live 2022, AI expansion stated 2026.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectYes
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Stage history

2022-11-22Operational · datacenterdynamics.com

Who is behind it

OperatorAmazon Web Services · Hyperscaler self-build

Who uses the compute

Built for Amazon Web Services's own use. No customer workload has been tied to this building on the public record.

Colocation price per kW of IT load per month

An own-use build. No colocation price applies.

Land
Industrial estateTSIIC (Telangana State Industrial Infrastructure Corporation) · 137,115 sqm Confirmed source ↗
Site in TSIIC's IP Chandanvelly at survey no. 190(P) of Chandanvelly village and 195(P) of Hythabad village, Shabad mandal.
Power supply
Dedicated substationTelangana state discom (the EMP names it TCPDCL) Confirmed source ↗
Chandanvelly EMP: Building-1 (phase 1) takes a 5 MVA grid connection. Building-2 (phases 2 and 3) takes a 48 MVA grid connection supported by an onsite substation. A switchgear and GIS substation building of 1,716 sqm is planned.
Water and cooling
WaterTSIIC pipeline or onsite borewell · 252 m³ a day Confirmed source ↗
Chandanvelly site. Fresh water of 252 KLD in operation.
Cooling Confirmed source ↗
The EMP says AWS halls are each served by an air handling room.

Sources checked 2026-10-22

  1. AWS launches new Indian cloud region in Hyderabad (DCD, 2022-11-22)
  2. Microsoft and AWS to increase data center presence in Telangana (DCD, 2023-01-20)
  3. Telangana secures Rs 60,000 crore AWS investment for data centres in Hyderabad (The Tribune, 2025-01-23)
  4. AWS breaks ground on new data centre in Hyderabad (Amazon, 2026-07-15)
  5. AWS breaks ground for new DC in Hyderabad, plans US$ 21 billion investment in India (W.Media, 2026-07-17)
  6. ENVIRONMENT MANAGEMENT PLAN (EMP) For Proposed Data Center By Amazon Data Services Pvt. Ltd. (ADSIPL) (Amazon Data Services India Pvt Ltd, filed on environmentclearance.nic.in (MoEFCC))
  7. Application of Environment Clearance (EC) for the proposed Data Center by Amazon Data Services India Private Limited (ADSIPL) situated at Hyderabad Pharma City (HPC) at District Ranga Reddy, Telangana (Amazon Data Services India Pvt Ltd, filed on environmentclearance.nic.in (MoEFCC), 2020-01-09)

Same campus, AWS Asia Pacific (Hyderabad)

More in Hyderabad

Also run by AWS

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.