TCS HyperVault Hyderabad AI campus

Hyderabad, Telangana, India · Hyderabad market · location approximate to city level

TCS HyperVault Hyderabad AI campus is a data center project in Hyderabad, India, operated by HyperVault (TCS). It is at the land and permitting stage. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Latest change on record: entered the record as land and permitting on 5 September 2026. Record last checked against its sources on 13 October 2026.

Open on the mapSuggest a correction
Stage
Land and permitting
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
HyperVault (TCS)
Colocation
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Open question2 of 7 gates passed
○ Land secured○ Power arranged○ Approvals granted✓ Money committed✓ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Land secured.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How India approves, powers and taxes data centers is on Data center rules in India.

Where it sits

Hyderabad holds 15 active projects with 1,128 MW of planned IT load between them, and TCS HyperVault Hyderabad AI campus has no published figure so it sits outside that ranking. Of those, 5 are operational, 3 are under construction, 3 are at the land and permitting stage and 4 are announced only. Published colocation vacancy in Hyderabad was 23.4% as of June 2025. Vacancy excludes hyperscaler self-build.

HyperVault has 1 other in India tracked by ArusGrid, including TCS HyperVault Anakapalli. Named funding comes from Tata Consultancy Services and TPG on the equity side. The named user of the compute is OpenAI (reported, unconfirmed).

The stage was recorded as at the land and permitting stage on 5 September 2026. The money on record is INR 700bn (about US$8.1bn) as of September 2026, the announced investment.

The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 5 public sources for this project, the latest dated 5 September 2026, and last checked the record on 13 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed client (reported)Yes
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Operator states high-density GPU, direct-to-chip liquid cooling, targets frontier AI labs.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectYes
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Stage history

2026-09-05Land and permitting · tcs.com

Who is behind it

OperatorHyperVault (TCS) · Colocation
Funder, EquityTata Consultancy Services
Funder, EquityTPG

Who uses the compute

Tenant · AI labOpenAI · reported, unconfirmed

100 MW · First customer of TCS HyperVault, 100MW initial with potential to scale to 1GW; site not named by either party · as of 2026-09-05

OpenAI's own 'OpenAI for India' announcement (18 Feb 2026) says it is 'the first customer of Tata Consultancy Services' HyperVault data center business, beginning with 100 megawatts of capacity and with potential to scale to 1 gigawatt over time'. Neither OpenAI nor TCS names a site. TCS's 5 Sep 2026 release and Business Standard present the Hyderabad Bharat Future City campus as HyperVault's first and only announced campus, so the link to this row is ArusGrid's; stays reported until TCS or OpenAI places the capacity.

Source · Introducing OpenAI for India (OpenAI, 2026-02-18)

Checked on 2026-10-02. No document names a confirmed user beyond the rows above.

Money at this site

Announced investment, 2026-09INR 700bn (about US$8.1bn)

The figure covers the whole campus.

Colocation price per kW of IT load per month

ArusGrid estimate, grade CINR 7,650 to INR 11,900 (about USD 91 to 142)

ArusGrid estimate, grade C. Published band for this country. Priced on the wholesale band. No usable capex for this site. Electricity unstated in the band. An estimate, never a quote, computed by fixed rules published on the Colo prices page and never counted in any total.

market band, wholesale (2024-12)INR 7,650 to INR 11,900 Cushman & Wakefield for Sify Infinit Spaces, 2025-10-16
Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources checked 2026-10-13

  1. TCS' HyperVault to establish large-scale AI data center campus in Telangana (Tata Consultancy Services, 2026-09-05)
  2. TCS unit to build Rs 70,000 crore data centre in Hyderabad (The News Minute, 2026-09-05)
  3. Hyderabad in spotlight as TCS, TPG launch mega AI Data Centre venture (Telangana Today, 2025-11-21)
  4. TCS Plans One-Gigawatt Capacity Data Center in Southern India (Bloomberg, 2026-09-05)
  5. TCS subsidiary HyperVault to invest up to Rs 70,000 crore in Hyderabad AI data centre (Telangana Today, 2026-09-05)

More in Hyderabad

Also run by HyperVault

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.