STT GDC Hyderabad Meerkhanpet campus is a data center project in Meerkhanpet, India, operated by STT GDC India. It has been announced and has not yet reached the land or permitting stage. The operator has not published a capacity figure, and ArusGrid does not estimate one.
Latest change on record: entered the record as announced on 20 January 2025. Record last checked against its sources on 20 October 2026.
Next gate to watch: Land secured.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How India approves, powers and taxes data centers is on Data center rules in India.
Hyderabad holds 15 active projects with 1,128 MW of planned IT load between them, and STT GDC Hyderabad Meerkhanpet campus has no published figure so it sits outside that ranking. Of those, 5 are operational, 3 are under construction, 3 are at the land and permitting stage and 4 are announced only. Published colocation vacancy in Hyderabad was 23.4% as of June 2025. Vacancy excludes hyperscaler self-build.
STT GDC has 9 others in India and 15 projects elsewhere in the dataset tracked by ArusGrid, including STT GDC Bengaluru Devanahalli campus, STT GDC Pune campus (Dighi) and STT Chennai Ambattur campus (Chennai 2, 3 and 4). Named funding comes from ST Telemedia on the equity side. No user of the capacity is on the public record as of 2026-10-02, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.
The stage was recorded as announced only on 20 January 2025. The money on record is INR 35bn (about US$404m) as of January 2025, the announced investment.
The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 2 public sources for this project, the latest dated 20 January 2025, and last checked the record on 20 October 2026.
One or two hard signals sit behind the announcement. The rules are fixed and published on the Methodology page.
Operator markets the campus as AI-ready.
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
Checked on 2026-10-02. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.
The figure covers the whole campus.
ArusGrid estimate, grade C. Published band for this country. Priced on the wholesale band. No usable capex for this site. Electricity unstated in the band. An estimate, never a quote, computed by fixed rules published on the Colo prices page and never counted in any total.