CapitaLand DC ITPH

Hyderabad, Telangana, India · Hyderabad market · location approximate to district level

CapitaLand DC ITPH is a data center project in Hyderabad, India, operated by CapitaLand Data Centre. It is under construction. It is planned for 27 MW of IT load.

Latest change on record: moved to under construction on 29 July 2026. Record last checked against its sources on 21 October 2026.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
27 MW
Running now
0 MW
Operators rarely publish this
Operator
CapitaLand Data Centre
Colocation
AI workloads
No signal either way
Evidence grade
Corroborated
Will it get built?Leaning yes5 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed○ Tenant or own use○ Builder appointed✓ Construction started

Next gate to watch: Tenant or own use.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How India approves, powers and taxes data centers is on Data center rules in India.

Where it sits

Hyderabad holds 15 active projects with 1,128 MW of planned IT load between them, and CapitaLand DC ITPH ranks 7th by planned capacity. Of those, 5 are operational, 3 are under construction, 3 are at the land and permitting stage and 4 are announced only. Published colocation vacancy in Hyderabad was 23.4% as of June 2025. Vacancy excludes hyperscaler self-build.

CapitaLand Investment has 2 others in India tracked by ArusGrid, including CapitaLand DC Chennai and CapitaLand DC ITPB Bengaluru. It sits on the International Tech Park Hyderabad. Named funding comes from CapitaLand India Trust and CapitaLand India Data Centre Fund on the equity side. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The dated record runs from under construction on 20 September 2023 to under construction on 29 July 2026. Power comes from Utility not named (dedicated GIS substation within site) through a dedicated substation at 220 kV. Cooling uses air cooling.

The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 11 public sources for this project, the latest dated 1 October 2026, and last checked the record on 21 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusNo signal either way

27 MW IT colo. No named tenant, liquid cooling or GPU disclosure for this site.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Stage history

2023-09-20Under construction · datacenterdynamics.com
2024-02-02Under construction · telanganatoday.com
2026-07-29Under construction · capitaland.com

Who is behind it

OperatorCapitaLand Data Centre · Colocation
Funder, EquityCapitaLand India Trust
Funder, EquityCapitaLand India Data Centre Fund

Who uses the compute

Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

ArusGrid estimate, building costabout US$152m to US$206m

No figure has been announced. This range is 27 MW of planned IT load times a published benchmark of US$6.64 per watt for Mumbai, plus or minus 15 percent. It covers the building and its mechanical and electrical plant. It excludes land, grid works, servers and fees.

Benchmark: Turner & Townsend Data Centre Construction Cost Index 2025, as reported by Data Storage Asia. An estimate is never added to any total on the site.

Colocation price per kW of IT load per month

ArusGrid estimate, grade CINR 7,650 to INR 11,900 (about USD 91 to 142)

ArusGrid estimate, grade C. Published band for this country. Priced on the wholesale band. No usable capex for this site. Electricity unstated in the band. An estimate, never a quote, computed by fixed rules published on the Colo prices page and never counted in any total.

market band, wholesale (2024-12)INR 7,650 to INR 11,900 Cushman & Wakefield for Sify Infinit Spaces, 2025-10-16
Power supply
Dedicated substationUtility not named (dedicated GIS substation within site) · 220kV · Jan 2025 Confirmed source ↗
CLINT reported the GIS cabling and 220kV GIS contract awarded (contractor not named).
Water and cooling
CoolingAir cooled Confirmed source ↗
N+3 redundant air-cooled chillers and N+2 CRAC units per data hall. Liquid cooling is an option. 11 data halls.

Sources checked 2026-10-21

  1. CapitaLand India Trust Annual Report 2025 (CapitaLand India Trust, 2025-12-31)
  2. CapitaLand India Trust records 8% increase in 1H 2026 distributable income (CapitaLand, 2026-07-29)
  3. CapitaLand India Trust gains leasing momentum with second hyperscaler agreement for data centre (CapitaLand, 2026-01)
  4. CapitaLand advances construction of state-of-the-art data centre at Madhapur (Telangana Today, 2024-02-02)
  5. CapitaLand Data Centre ITPH, Hyderabad (CapitaLand, 2026-10-01)
  6. CLINT 1H 2026 Financial Results (CapitaLand India Trust, 2026-07-29)
  7. Ground broken on CapitaLand data center in Hyderabad, India (DCD, 2023-09-25)
  8. DBS Vickers Pulse of Asia Conference 2025 (CapitaLand India Trust (SGX filing), 2025-01-08)
  9. CapitaLand DC ITPH Factsheet (CapitaLand)
  10. CapitaLand's Hyderabad DC awarded TIA-942 RATED 3 Design Certification (W.Media, 2023-12-20)
  11. CapitaLand DC ITPH Factsheet (CapitaLand)

More in Hyderabad

Also run by CapitaLand Investment

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.