CapitaLand DC ITPB Bengaluru is a data center project in Whitefield, Bengaluru, India, operated by CapitaLand Data Centre. It has been announced and has not yet reached the land or permitting stage. It is planned for 27 MW of IT load.
Latest change on record: entered the record as announced on 25 September 2026. Record last checked against its sources on 21 October 2026.
Next gate to watch: Approvals granted.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How India approves, powers and taxes data centers is on Data center rules in India.
Bengaluru holds 4 active projects with 217 MW of planned IT load between them, and CapitaLand DC ITPB Bengaluru ranks third by planned capacity. Of those, 2 are operational and 2 are announced only. Published colocation vacancy in Bengaluru was 37% as of June 2025. Vacancy excludes hyperscaler self-build.
CapitaLand Investment has 2 others in India tracked by ArusGrid, including CapitaLand DC Chennai and CapitaLand DC ITPH. It sits on the International Tech Park Bangalore. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.
The stage was recorded as announced only on 25 September 2026. The money on record is INR 20bn (about US$233m) as of September 2026, the announced investment. Power comes from ITPB park substation (BESCOM/KPTCL grid) through a dedicated substation at 220 kV (reported, unconfirmed).
The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 3 public sources for this project, the latest dated 25 September 2026, and last checked the record on 21 October 2026.
One or two hard signals sit behind the announcement. The rules are fixed and published on the Methodology page.
No public signal either way.
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.
ArusGrid estimate, grade C. Published band for this country. Priced on the wholesale band. No usable capex for this site. Electricity unstated in the band. An estimate, never a quote, computed by fixed rules published on the Colo prices page and never counted in any total.
All projects in Bengaluru · All projects in India · All CapitaLand Investment projects · All projects announced only · Data center rules in India · Full directory