ArusGridProject
Directory › India › Bengaluru › CapitaLand DC ITPB Bengaluru

CapitaLand DC ITPB Bengaluru

Whitefield, Bengaluru, Karnataka, India · Bengaluru market · location approximate to district level

CapitaLand DC ITPB Bengaluru is a data center project in Whitefield, Bengaluru, India, operated by CapitaLand Data Centre. It has been announced and has not yet reached the land or permitting stage. It is planned for 27 MW of IT load.

Latest change on record: entered the record as announced on 25 September 2026. Record last checked against its sources on 21 October 2026.

Open on the mapSuggest a correction
Stage
Announced
Planned IT load
27 MW
Running now
Not disclosed
Operators rarely publish this
Operator
CapitaLand Data Centre
Colocation
AI workloads
No signal either way
Evidence grade
Sourced
Will it get built?Open question2 of 7 gates passed
✓ Land secured✓ Power arranged○ Approvals granted○ Money committed○ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Approvals granted.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How India approves, powers and taxes data centers is on Data center rules in India.

Where it sits

Bengaluru holds 4 active projects with 217 MW of planned IT load between them, and CapitaLand DC ITPB Bengaluru ranks third by planned capacity. Of those, 2 are operational and 2 are announced only. Published colocation vacancy in Bengaluru was 37% as of June 2025. Vacancy excludes hyperscaler self-build.

CapitaLand Investment has 2 others in India tracked by ArusGrid, including CapitaLand DC Chennai and CapitaLand DC ITPH. It sits on the International Tech Park Bangalore. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The stage was recorded as announced only on 25 September 2026. The money on record is INR 20bn (about US$233m) as of September 2026, the announced investment. Power comes from ITPB park substation (BESCOM/KPTCL grid) through a dedicated substation at 220 kV (reported, unconfirmed).

The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 3 public sources for this project, the latest dated 25 September 2026, and last checked the record on 21 October 2026.

How well evidenced is it

One or two hard signals sit behind the announcement. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusNo signal either way

No public signal either way.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Stage history

2026-09-25Announced · newsable.asianetnews.com

Who is behind it

OperatorCapitaLand Data Centre · Colocation

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Money at this site

Announced investment, 2026-09INR 20bn (about US$233m)

Colocation price per kW of IT load per month

ArusGrid estimate, grade CINR 7,650 to INR 11,900 (about USD 91 to 142)

ArusGrid estimate, grade C. Published band for this country. Priced on the wholesale band. No usable capex for this site. Electricity unstated in the band. An estimate, never a quote, computed by fixed rules published on the Colo prices page and never counted in any total.

market band, wholesale (2024-12)INR 7,650 to INR 11,900 Cushman & Wakefield for Sify Infinit Spaces, 2025-10-16
Land
Industrial estateInternational Tech Park Bangalore (CapitaLand India Trust, own estate) · Jan 2025 Reported source ↗
DC site identified within the 69-acre ITPB owned by CLINT; plot area not disclosed
Power supply
Dedicated substationITPB park substation (BESCOM/KPTCL grid) · 120 MVA · 220kV · Jan 2025 Reported source ↗
ITPB 40 MVA AIS substation upgraded to 120 MVA GIS ahead of DC construction; 220kV GIS development completed 1Q 2024. Slide layout makes bullet-to-site mapping slightly ambiguous · Applies to the whole campus.
Water and cooling
Cooling Confirmed source ↗
High-efficiency chillers with water economisation per the property page. Page undated, read 2026-10-18.
Cooling Confirmed source ↗
High-efficiency chillers and water economization. Chiller type not stated.

Sources checked 2026-10-21

  1. CapitaLand, STT GDC to expand data centre capacity in Karnataka (Asianet Newsable (ANI), 2026-09-25)
  2. CapitaLand Data Centre ITPB Bangalore (CapitaLand)
  3. DBS Vickers Pulse of Asia Conference 2025 (SGX / CapitaLand India Trust, 2025-01-08)

More in Bengaluru

Also run by CapitaLand Investment

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.