NTT Bengaluru 4 campus

Devanahalli, Karnataka, India · Bengaluru market · location approximate to district level

NTT Bengaluru 4 campus is a data center project in Devanahalli, India, operated by NTT Global Data Centers. It is operational. It is planned for 67 MW of IT load. The operator reports 22 MW running.

Latest change on record: moved to operational on 13 June 2026. Record last checked against its sources on 21 October 2026.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
67 MW
Running now
22 MW
Operators rarely publish this
Operator
NTT Global Data Centers
Colocation
AI workloads
Likely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How India approves, powers and taxes data centers is on Data center rules in India.

Where it sits

Bengaluru holds 4 active projects with 217 MW of planned IT load between them, and NTT Bengaluru 4 campus ranks second by planned capacity. Of those, 2 are operational and 2 are announced only. Published colocation vacancy in Bengaluru was 37% as of June 2025. Vacancy excludes hyperscaler self-build.

NTT has 6 others in India tracked by ArusGrid, including NTT Navi Mumbai 2 (NAV2), NTT Navi Mumbai 1 (NAV1) campus and NTT Noida 2 campus. It sits on the NTT Bengaluru 4 campus. Named funding comes from NTT on the equity side. No user of the capacity is on the public record as of 2026-10-02, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The build is phased. Bengaluru 4A at 22 MW is commissioning with a 2025 target; Bengaluru 4B at 22 MW is announced; Bengaluru 4C at 22 MW is announced. The dated record runs from being commissioned on 3 December 2025 to operational on 13 June 2026. Cooling uses air cooling.

The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 6 public sources for this project, the latest dated 22 June 2026, and last checked the record on 21 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Operator markets the campus as AI-ready; no cooling disclosure.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

Bengaluru 4A · Commissioning22 MW, target 2025
Bengaluru 4B · Announced22 MW
Bengaluru 4C · Announced22 MW

Stage history

2025-12-03Commissioning · business-standard.com
2026-06-13Operational · aninews.in

Who is behind it

OperatorNTT Global Data Centers · Colocation
Funder, EquityNTT

Who uses the compute

Checked on 2026-10-02. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

ArusGrid estimate, building costabout US$379m to US$564m

No figure has been announced. This range is 67 MW of planned IT load times a published benchmark of US$6.64 per watt for Mumbai, plus or minus 15 percent, with 10 percent more at the top for liquid cooling because the project is AI-positioned. It covers the building and its mechanical and electrical plant. It excludes land, grid works, servers and fees.

Benchmark: Turner & Townsend Data Centre Construction Cost Index 2025, as reported by Data Storage Asia. An estimate is never added to any total on the site.

Colocation price per kW of IT load per month

ArusGrid estimate, grade CINR 6,800 to INR 8,900 (about USD 81 to 106)

ArusGrid estimate, grade C. Published band for this country. Priced on the hyperscale band, which already reflects anchor deals. No usable capex for this site. Electricity unstated in the band. An estimate, never a quote, computed by fixed rules published on the Colo prices page and never counted in any total.

market band, hyperscale (2024-12)INR 6,800 to INR 8,900 Cushman & Wakefield for Sify Infinit Spaces, 2025-10-16
Land
Industrial estatePrestige Tech Cloud, Devanahalli · 8.5 acres · Dec 2025 Reported source ↗
8.5-acre campus inside Prestige Tech Cloud.
Power supply
Dedicated substation100 MW · 220kV · Dec 2025 Reported source ↗
Release mentions renewable integration, no PPA named. · A 220kV LILO from the state grid feeds the dedicated GIS substation. 100MW is total facility load. · Applies to the whole campus.
Water and cooling
CoolingAir cooled Confirmed source ↗
Air-cooled chiller systems with N+2 redundancy. Each of the three planned buildings (4A, 4B, 4C) is 22.4MW IT.

Sources checked 2026-10-21

  1. NTT Unveils Bengaluru's Largest Data Center Campus - Bengaluru 4 (Business Standard (ANI), 2025-12-03)
  2. NTT DATA Opens Bengaluru 4 Data Center (ANI, 2026-06-13)
  3. NTT Unveils Bengaluru's Largest Data Center Campus – Bengaluru 4 (The Week (PTI), 2025-12-03)
  4. NTT Global Data Centres acquires land to set up data centers in Bangalore (JSA Advocates & Solicitors)
  5. Bengaluru 4 Campus (NTT DATA)
  6. NTT India Loan (IFC, 2026-06-22)

More in Bengaluru

Also run by NTT

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.