NTT Navi Mumbai 2 (NAV2) is a data center project in Navi Mumbai, India, operated by NTT Global Data Centers. It has been announced and has not yet reached the land or permitting stage. It is planned for 336 MW of IT load.
Latest change on record: entered the record as announced on 20 March 2025. Record last checked against its sources on 22 October 2026.
Next gate to watch: Land secured.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How India approves, powers and taxes data centers is on Data center rules in India.
Mumbai metro holds 32 active projects with 2,694 MW of planned IT load between them, and NTT Navi Mumbai 2 (NAV2) ranks first by planned capacity. Of those, 4 are operational, 5 are operational and expanding, 11 are under construction, 6 are at the land and permitting stage and 6 are announced only. Published colocation vacancy in Mumbai metro was 6.6% as of June 2025. Vacancy excludes hyperscaler self-build.
NTT has 6 others in India tracked by ArusGrid, including NTT Navi Mumbai 1 (NAV1) campus, NTT Bengaluru 4 campus and NTT Noida 2 campus. It sits on the NTT NAV2 Airoli campus. Named funding comes from NTT DATA on the equity side. No user of the capacity is on the public record as of 2026-10-02, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.
The stage was recorded as announced only on 20 March 2025. Cooling uses immersion cooling.
The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 7 public sources for this project, the latest dated 6 October 2025, and last checked the record on 22 October 2026.
One or two hard signals sit behind the announcement. The rules are fixed and published on the Methodology page.
Greenfield campus announced at 336MW IT capacity; W.Media's coverage of the launch cites liquid immersion and direct-contact liquid cooling designs, which the operator has not confirmed in a source reached.
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
Checked on 2026-10-02. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.
No figure has been announced. This range is 336 MW of planned IT load times a published benchmark of US$6.64 per watt for Mumbai, plus or minus 15 percent, with 10 percent more at the top for liquid cooling because the project is AI-positioned. It covers the building and its mechanical and electrical plant. It excludes land, grid works, servers and fees.
Benchmark: Turner & Townsend Data Centre Construction Cost Index 2025, as reported by Data Storage Asia. An estimate is never added to any total on the site.
ArusGrid estimate, grade C. Published band for this country. Priced on the hyperscale band, which already reflects anchor deals. No usable capex for this site. Electricity unstated in the band. An estimate, never a quote, computed by fixed rules published on the Colo prices page and never counted in any total.