PDG MU2 data center

Navi Mumbai, Maharashtra, India · Mumbai metro market · location approximate to city level

PDG MU2 is a data center project in Navi Mumbai, India, operated by Princeton Digital Group. It is under construction. It is planned for 120 MW of IT load.

Latest change on record: moved to under construction on 10 April 2026. Record last checked against its sources on 22 October 2026.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
120 MW
Running now
Not disclosed
Operators rarely publish this
Operator
Princeton Digital Group
Colocation
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Leaning yes5 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed○ Tenant or own use○ Builder appointed✓ Construction started

Next gate to watch: Tenant or own use.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How India approves, powers and taxes data centers is on Data center rules in India.

Where it sits

Mumbai metro holds 32 active projects with 2,694 MW of planned IT load between them, and PDG MU2 ranks 8th by planned capacity. Of those, 4 are operational, 5 are operational and expanding, 11 are under construction, 6 are at the land and permitting stage and 6 are announced only. Published colocation vacancy in Mumbai metro was 6.6% as of June 2025. Vacancy excludes hyperscaler self-build.

PDG has 1 other in India tracked by ArusGrid, including PDG MU1 campus. It sits on the PDG MU2 campus. Named funding comes from Warburg Pincus, Ontario Teachers' Pension Plan, Mubadala and Stonepeak on the equity side. No user of the capacity is on the public record as of 2026-10-02, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The dated record runs from at the land and permitting stage on 25 March 2026 to under construction on 10 April 2026. Power comes from Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) through a dedicated substation at 220 kV.

The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 4 public sources for this project, the latest dated 1 June 2026, and last checked the record on 22 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

120MW greenfield started 2026.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Stage history

2026-03-25Land and permitting · datacenterdynamics.com
2026-04-10Under construction · datacenterdynamics.com

Who is behind it

OperatorPrinceton Digital Group · Colocation
Funder, EquityWarburg Pincus
Funder, EquityOntario Teachers' Pension Plan
Funder, EquityMubadala
Funder, EquityStonepeak

Who uses the compute

Checked on 2026-10-02. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

ArusGrid estimate, building costabout US$677m to US$1.0bn

No figure has been announced. This range is 120 MW of planned IT load times a published benchmark of US$6.64 per watt for Mumbai, plus or minus 15 percent, with 10 percent more at the top for liquid cooling because the project is AI-positioned. It covers the building and its mechanical and electrical plant. It excludes land, grid works, servers and fees.

Benchmark: Turner & Townsend Data Centre Construction Cost Index 2025, as reported by Data Storage Asia. An estimate is never added to any total on the site.

Colocation price per kW of IT load per month

Shell lease on record, grade AINR 98.5 per sq ft per month

registered lease, PDG as lessee of 1,058,568 sq ft at Mindspace Airoli West, 20 and 40 year terms, 15-year lock-in, 4 percent escalation Electricity excluded. As of 2025-04. Business Standard on CRE Matrix data, 2025-05-05

The operator's own shell cost, about INR 125 crore a year. A hyperscaler rent at this campus must clear it plus fit-out.

A powered shell leased to its tenant, which is a different product from colocation, so no per kW price applies.

Land
Site10 acres · Apr 2026 Reported source ↗
Five-storey building, 18,880 sqm colocation; construction commenced per PDG LinkedIn after groundbreaking that week. Counterparty not disclosed.
Industrial estateMIDC (TTC Industrial Area, Plot D-31 and D-32, Turbhe, Navi Mumbai) · 39,980 sqm · Jun 2026 Inferred by ArusGrid source ↗
The report says the land is owned by the project proponent, Amanthin Info Parks Pvt Ltd. MIDC sanctioned the master plan on 2 Nov 2022.
Why we think so. Report is hosted on princetondg.com. The site (Plot D-31 and D-32, TTC Industrial Area, Turbhe) is a separate Navi Mumbai plot from MU1 at Airoli. Its 39,980 sqm plot is about 9.9 acres, matching MU2's 10 acres, and its G+4 data centre building matches MU2's five storeys.
Power supply
Dedicated substationMaharashtra State Electricity Distribution Co. Ltd (MSEDCL) · 240 MVA · 220kV · Jun 2026 Inferred by ArusGrid source ↗
The EC lists MSEDCL as the power source with 4 x 60MVA 220/22kV transformers, a connected load of 103,367 kVA, a demand load of 108,807 kVA and 58 DG sets of 2,200 kVA. RCC and finishing work for the on-site substation was complete by March 2026.
Water and cooling
WaterMains drinking water · MIDC (water supply NOC dated 1 Sep 2021) · 40.7 m³ a day Inferred by ArusGrid source ↗
Dry season water demand is 40.7 cubic metres a day (32.5 fresh, 8.2 recycled). Wet season demand is 8.7 cubic metres a day. On-site STP of 10 cubic metres a day.
Cooling Inferred by ArusGrid source ↗
Cooling type not stated.

Sources checked 2026-10-22

  1. PDG breaks ground on latest Mumbai data center (DCD, 2026-04-10)
  2. PDG breaks ground on MU2 DC campus in Mumbai (W.Media, 2026-04-13)
  3. PDG plans two more data center campuses in India totaling 210MW (DCD, 2026-03-25)
  4. Six Monthly Compliance Report of Amanthin Info Parks Pvt. Ltd. (Amanthin Info Parks Pvt. Ltd. (hosted on Princeton Digital Group website), 2026-06-01)

More in Mumbai metro

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.