Iron Mountain MUM-3 data center

Navi Mumbai, Maharashtra, India · Mumbai metro market · location approximate to district level

Iron Mountain MUM-3 is a data center project in Navi Mumbai, India, operated by Iron Mountain Data Centers (Web Werks JV). It is under construction. It is planned for 85 MW of IT load.

Latest change on record: moved to under construction in January 2026. Record last checked against its sources on 21 October 2026.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
85 MW
Running now
Not disclosed
Operators rarely publish this
Operator
Iron Mountain Data Centers (Web Werks JV)
Joint venture
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Leaning yes5 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed○ Tenant or own use○ Builder appointed✓ Construction started

Next gate to watch: Tenant or own use.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How India approves, powers and taxes data centers is on Data center rules in India.

Where it sits

Mumbai metro holds 32 active projects with 2,694 MW of planned IT load between them, and Iron Mountain MUM-3 ranks 11th by planned capacity. Of those, 4 are operational, 5 are operational and expanding, 11 are under construction, 6 are at the land and permitting stage and 6 are announced only. Published colocation vacancy in Mumbai metro was 6.6% as of June 2025. Vacancy excludes hyperscaler self-build.

Iron Mountain has 1 other in India tracked by ArusGrid, including Iron Mountain Chennai (CHN-1 and CHN-2). It sits on the Iron Mountain Navi Mumbai (Web Werks) campus. Named funding comes from Iron Mountain and Web Werks. No user of the capacity is on the public record as of 2026-10-02, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The dated record runs from announced only on 9 June 2023 to under construction in January 2026. Power comes from unspecified (MSEDCL area) through a dedicated substation (reported, unconfirmed). Cooling uses hybrid air and liquid cooling.

The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 7 public sources for this project, the latest dated 18 October 2026, and last checked the record on 21 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Operator describes hyperscale-ready capacity; 85MW greenfield.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

MUM-3 · Under construction85 MW, target 2028

Stage history

2023-06-09Announced · telecomtalk.info
2026-01Under construction · w.media

Who is behind it

OperatorIron Mountain Data Centers (Web Werks JV) · Joint venture
Funder, Joint venture partnerIron Mountain
Funder, Joint venture partnerWeb Werks

Who uses the compute

Checked on 2026-10-02. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

ArusGrid estimate, building costabout US$480m to US$714m

No figure has been announced. This range is 85 MW of planned IT load times a published benchmark of US$6.64 per watt for Mumbai, plus or minus 15 percent, with 10 percent more at the top for liquid cooling because the project is AI-positioned. It covers the building and its mechanical and electrical plant. It excludes land, grid works, servers and fees.

Benchmark: Turner & Townsend Data Centre Construction Cost Index 2025, as reported by Data Storage Asia. An estimate is never added to any total on the site.

Colocation price per kW of IT load per month

No colocation price applies to this product (retail interconnection, no colocation price applies).

Land
Land sellerNot disclosed · 5 acres · Jun 2023 Confirmed source ↗
The JV said in June 2023 it had already acquired a parcel of about 5 acres in Rabale for MUM-3. The seller and terms are not named. The operator page now gives a 5.5 acre campus shared with MUM-1 and MUM-2.
Power supply
Dedicated substationunspecified (MSEDCL area) · 120 MVA · Jun 2023 Reported source ↗
Approved additional substation for the campus per the JV's 2023 release. · Applies to the whole campus.
Dedicated substation137 MVA · Oct 2026 Confirmed source ↗
The operator page gives 137MVA gross with a dedicated on-site substation for 85MW IT.
Water and cooling
CoolingHybrid air and liquid cooling Confirmed source ↗
Advanced cooling for high-density compute including liquid cooling.

Sources checked 2026-10-21

  1. Mumbai Data Centers | India Colocation | Iron Mountain (Iron Mountain (operator site, accessed), 2026-09-27)
  2. Web Werks – Iron Mountain Data Centers JV to Expand Mumbai Campus With Third Facility (TelecomTalk, 2023-06-09)
  3. Iron Mountain Data Centers breaks ground on 85 MW AI DC campus in Mumbai (W.Media, 2026-01-21)
  4. Iron Mountain breaks ground on 85MW AI-ready data centre in Mumbai (Iron Mountain, 2026-02-18)
  5. IMDC Mumbai MUM-3 data center (Iron Mountain, 2026-10-18)
  6. Web Werks-Iron Mountain to invest Rs 1,400 cr to develop data center in Navi Mumbai (Web Werks, 2023-06-14)
  7. Iron Mountain Data Centers breaks ground on 85 MW AI DC campus in Mumbai (W.Media, 2026-01-21)

More in Mumbai metro

Also run by Iron Mountain

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.