ArusGrid tracks 4 active data center projects in Bengaluru, India, with 217 MW of planned IT load. Of these, 2 are operational and 2 are announced only. Operators have disclosed 45 MW actually running, a figure most of them do not publish.
The largest project is STT GDC Bengaluru Devanahalli campus at 100 MW, announced only. The operators with the most planned capacity here are STT GDC (123 MW across 2 projects), NTT (67 MW across 1 project) and CapitaLand Investment (27 MW across 1 project). Published colocation vacancy in Bengaluru was 37% as of June 2025. Vacancy excludes hyperscaler self-build.
The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”.
| Project | City | Stage | Planned MW | Running MW | Operator | AI |
|---|---|---|---|---|---|---|
| STT GDC Bengaluru Devanahalli campus | Devanahalli | Announced | 100 * | undisclosed | STT GDC India | No signal either way |
| NTT Bengaluru 4 campus | Devanahalli | Operational | 67 | 22 | NTT Global Data Centers | Likely |
| CapitaLand DC ITPB Bengaluru | Whitefield, Bengaluru | Announced | 27 | undisclosed | CapitaLand Data Centre | No signal either way |
| STT GDC Bengaluru Whitefield campus | Bengaluru (Whitefield) | Operational | 23 | 23 | STT GDC India | Unlikely |
STT GDC · NTT · CapitaLand Investment
All projects in India · Full directory