ArusGridMarket
Directory › India › Bengaluru

Data center projects in Bengaluru

India · India · dataset updated 2026-10-18

ArusGrid tracks 4 active data center projects in Bengaluru, India, with 217 MW of planned IT load. Of these, 2 are operational and 2 are announced only. Operators have disclosed 45 MW actually running, a figure most of them do not publish.

The largest project is STT GDC Bengaluru Devanahalli campus at 100 MW, announced only. The operators with the most planned capacity here are STT GDC (123 MW across 2 projects), NTT (67 MW across 1 project) and CapitaLand Investment (27 MW across 1 project). Published colocation vacancy in Bengaluru was 37% as of June 2025. Vacancy excludes hyperscaler self-build.

The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”.

Open the mapPipeline view

All projects largest planned capacity first

ProjectCityStagePlanned MWRunning MWOperatorAI
STT GDC Bengaluru Devanahalli campusDevanahalliAnnounced100 *undisclosedSTT GDC IndiaNo signal either way
NTT Bengaluru 4 campusDevanahalliOperational6722NTT Global Data CentersLikely
CapitaLand DC ITPB BengaluruWhitefield, BengaluruAnnounced27undisclosedCapitaLand Data CentreNo signal either way
STT GDC Bengaluru Whitefield campusBengaluru (Whitefield)Operational2323STT GDC IndiaUnlikely

Other markets in India

Operators here with their own page

* marks a capacity figure whose source states a basis other than IT load. Planned MW is IT load unless marked. Running capacity is rarely published, so a missing figure means undisclosed. Cancelled projects are listed and excluded from every total. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. This page is generated from the dataset, so it cannot drift from the map.