Data center projects in Visakhapatnam

India · India · dataset updated 2026-10-18

ArusGrid tracks 9 active data center projects in Visakhapatnam, India, with 2,148 MW of planned IT load. Of these, 2 are under construction, 3 are at the land and permitting stage and 4 are announced only. Projects under construction or commissioning account for 50 MW.

The largest project is ReNew AP Green Data Center at 1,000 MW, announced only. The operators with the most planned capacity here are ReNew Energy Global (1,000 MW across 1 project), AM Group (AM Intelligence Labs) (512 MW across 1 project) and Colt DCS and RMZ (486 MW across 1 project). No third party publishes a colocation vacancy rate for Visakhapatnam, and ArusGrid does not estimate one.

The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”.

Open the mapPipeline view

All projects largest planned capacity first

ProjectCityStagePlanned MWRunning MWOperatorAI
ReNew AP Green Data CenterMakavaripalemAnnounced1,000 *undisclosedRenew APLikely
AM AI Factory VizagBheemunipatnamAnnounced512 *undisclosedAM AI Factory (Vizag) Pvt LtdLikely
Data Centre Holdings India AnandapuramAnandapuramAnnounced486 *undisclosedData Centre Holdings India LLPLikely
CtrlS AnakapalleRambilliAnnounced100 *undisclosedCtrlS DatacentersLikely
Sify Vizag AI data centre and open CLSVisakhapatnamUnder construction50undisclosedSify Infinit SpacesLikely
Google India AI Hub (Visakhapatnam)VisakhapatnamUnder constructionnone publishedundisclosedAdaniConneXLikely
Reliance Vizianagaram AI Data CentreBhogapuramLand and permittingnone publishedundisclosedReliance IndustriesLikely
Sify Paradesipalem campusParadesipalem, VisakhapatnamLand and permittingnone publishedundisclosedSify Infinit SpacesNo signal either way
TCS HyperVault AnakapalliAnakapalli districtLand and permittingnone publishedundisclosedHyperVault (TCS)Likely

Other markets in India

Operators here with their own page

* marks a capacity figure whose source states a basis other than IT load. Planned MW is IT load unless marked. Running capacity is rarely published, so a missing figure means undisclosed. Cancelled projects are listed and excluded from every total. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. This page is generated from the dataset, so it cannot drift from the map.