ArusGridProject
Directory › Singapore › Singapore › Meta Singapore Data Center

Meta Singapore Data Center

Singapore, Singapore · Singapore market

Meta Singapore Data Center is a data center project in Singapore, operated by Meta. It is operational. The only published capacity figure is 150 MW of total facility power. IT load will be lower.

Latest change on record: moved to operational in 2022. Record last checked against its sources on 17 October 2026.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
150 MW
Total facility power
Running now
Not disclosed
Operators rarely publish this
Operator
Meta
Hyperscaler self-build
AI workloads
Likely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Singapore approves, powers and taxes data centers is on Data center rules in Singapore.

Where it sits

Singapore holds 39 active projects with 874 MW of planned IT load between them, and Meta Singapore Data Center ranks first by planned capacity. Of those, 27 are operational, 3 are operational and expanding, 3 are under construction, 1 is past financial close and 5 are announced only. Published colocation vacancy in Singapore was 4.9% as of December 2025, on 1,043 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

It is the only Meta project ArusGrid tracks. The named user of the compute is Meta (own use) (confirmed).

The dated record runs from under construction in September 2018 to operational in 2022. The money on record is S$1,400m (about US$1.0bn) as of September 2018, the announced investment. Power comes from Sunseap Group through a renewable power purchase agreement (reported, unconfirmed). Cooling uses evaporative cooling, with a design PUE of 1.19.

Grid power for a large industrial user in Singapore costs about US$0.20 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Singapore, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 6 public sources for this project, the latest dated 21 June 2024, and last checked the record on 17 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsNo

AI workloads

StatusLikely

hyperscaler self-build (Meta own-use)

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectYes
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

Full fit-out · Operational150 MW

Stage history

2018-09Under construction · engineering.fb.com
2022Operational · dgtlinfra.com

Who is behind it

OperatorMeta · Hyperscaler self-build

Who uses the compute

Own use · hyperscalerMeta (own use) · confirmed

Whole campus, Meta's first APAC data centre, 11 storeys on 12 acres at Tanjong Kling · as of 2022-10-14

Meta's own careers blog describes the Tanjong Kling facility as its first APAC data centre supporting Meta services for the region. Adds a Meta-authored source to an existing confirmed row.

Source · Singapore Data Center: Building and innovating from the ground up (Meta, 2022-10-14)

Money at this site

Announced investment, 2018-09S$1,400m (about US$1.0bn)

Colocation price per kW of IT load per month

An own-use build. No colocation price applies.

Project team
Main contractorFortis Construction · Sep 2018 · completed Confirmed source ↗
General contractor for Facebook's first custom-built data centre in Asia. Fortis opened its first international office in Singapore for the job.
Land
Site12 acres · Sep 2018 Reported source ↗
Tanjong Kling Data Centre Park (JTC estate); a Sept 2018 law-firm deal note says JTC, PUB, IMDA and EDB were in the negotiations but does not state tenure, so landlord not asserted Counterparty not disclosed.
Power supply
Renewable power dealSunseap Group · 100 MW · Oct 2020 Reported source ↗
100MW rooftop solar, completion 2022 · Supports Facebook SG data centre operations · Covers the operator's wider portfolio in this country, not this site alone.
Water and cooling
CoolingEvaporative cooling · design PUE 1.19 Confirmed source ↗
StatePoint Liquid Cooling (SPLC), indirect evaporative system developed with Nortek Air Solutions; reduces peak water use >20% vs alternatives in Singapore climate

Sources checked 2026-10-17

  1. datacentermap.com
  2. datacenterdynamics.com
  3. baxtel.com
  4. Facebook to build $1bn multi-story data center in Singapore (DatacenterDynamics, 2018-09-06)
  5. Rethinking data center design for Singapore (Facebook Engineering, 2019-01-14)
  6. Meta's Data Center Locations for Facebook and Instagram (Dgtl Infra, 2024-06-21)

More in Singapore

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.