Meta Singapore Data Center is a data center project in Singapore, operated by Meta. It is operational. The only published capacity figure is 150 MW of total facility power. IT load will be lower.
Latest change on record: moved to operational in 2022. Record last checked against its sources on 17 October 2026.
This project is built or running, so every gate counts as passed.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How Singapore approves, powers and taxes data centers is on Data center rules in Singapore.
Singapore holds 39 active projects with 874 MW of planned IT load between them, and Meta Singapore Data Center ranks first by planned capacity. Of those, 27 are operational, 3 are operational and expanding, 3 are under construction, 1 is past financial close and 5 are announced only. Published colocation vacancy in Singapore was 4.9% as of December 2025, on 1,043 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.
It is the only Meta project ArusGrid tracks. The named user of the compute is Meta (own use) (confirmed).
The dated record runs from under construction in September 2018 to operational in 2022. The money on record is S$1,400m (about US$1.0bn) as of September 2018, the announced investment. Power comes from Sunseap Group through a renewable power purchase agreement (reported, unconfirmed). Cooling uses evaporative cooling, with a design PUE of 1.19.
Grid power for a large industrial user in Singapore costs about US$0.20 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Singapore, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 6 public sources for this project, the latest dated 21 June 2024, and last checked the record on 17 October 2026.
Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.
hyperscaler self-build (Meta own-use)
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
Whole campus, Meta's first APAC data centre, 11 storeys on 12 acres at Tanjong Kling · as of 2022-10-14
Meta's own careers blog describes the Tanjong Kling facility as its first APAC data centre supporting Meta services for the region. Adds a Meta-authored source to an existing confirmed row.
Source · Singapore Data Center: Building and innovating from the ground up (Meta, 2022-10-14)
An own-use build. No colocation price applies.
All projects in Singapore · All projects in Singapore · All projects operational · Data center rules in Singapore · Full directory