Directory › Indonesia › Greater Jakarta › IndoKeppel Data Centre 1 (IKDC1), Bogor

IndoKeppel Data Centre 1 (IKDC1), Bogor

Citeureup, Bogor Regency, West Java, Indonesia · Greater Jakarta market · location approximate to district level

IndoKeppel Data Centre 1 (IKDC1), Bogor is a data center project in Citeureup, Bogor Regency, Indonesia, operated by IndoData Data Center (formerly IndoKeppel Data Centres), wholly owned by Salim Group. It is operational and expanding. It is planned for 50 MW of IT load. The operator reports 11 MW running.

Record last checked against its sources on 21 October 2026.

Open on the mapSuggest a correction
Stage
Expanding
Planned IT load
50 MW
Running now
11 MW
Operators rarely publish this
Operator
IndoData Data Center (formerly IndoKeppel Data Centres), wholly owned by Salim Group
Local developer
AI workloads
No signal either way
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Indonesia approves, powers and taxes data centers is on Data center rules in Indonesia.

Where it sits

Greater Jakarta holds 37 active projects with 3,240 MW of planned IT load between them, and IndoKeppel Data Centre 1 (IKDC1), Bogor ranks 12th by planned capacity. Of those, 12 are operational, 10 are operational and expanding, 8 are under construction, 1 is being commissioned, 1 is at the land and permitting stage, 3 are announced only and 2 are on hold. Published colocation vacancy in Greater Jakarta was 24.9% as of December 2025, on 322 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

It is the only IndoData project ArusGrid tracks. It sits on the IndoKeppel Bogor campus. Named funding comes from Keppel and Salim Group. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The build is phased. Phase 1 at 5 MW is operational with a 2022 target; Expansion for existing hyperscale client at 6 MW is operational with a 2026 target; Later phases is announced. Power comes from PLN through grid supply (reported, unconfirmed).

Grid power for a large industrial user in Indonesia costs about US$0.062 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Indonesia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 8 public sources for this project, the latest dated 18 October 2026, and last checked the record on 21 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed client (reported)Yes
Committed or approved capitalNo
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusNo signal either way

No public signal either way.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

Phase 1 · Operational5 MW, target 2022
Expansion for existing hyperscale client · Operational6 MW, target 2026
Later phases · AnnouncedSize not published

Who is behind it

OperatorIndoData Data Center (formerly IndoKeppel Data Centres), wholly owned by Salim Group · Local developer
Funder, Joint venture partnerKeppel
Funder, Joint venture partnerSalim Group

Who uses the compute

Tenant · hyperscalerUndisclosed hyperscaler (existing IndoData client) · reported, unconfirmed

6 MW · Built-to-suit 6MW IT-load expansion at IKDC1 · as of 2026-08-27

DCD, reporting Salim's buyout of Keppel's stake, quotes the venture (now IndoData) that a 6MW IT-load expansion 'was developed for one of our existing hyperscale clients'. Name not given; 500MW under PLN contract for the site.

Source · Salim Group buys out Keppel's share of Indonesian data center venture (DCD, 2026-08-27)

Money at this site

ArusGrid estimate, building costabout US$476m to US$645m

No figure has been announced. This range is 50 MW of planned IT load times a published benchmark of US$11.21 per watt for Jakarta, plus or minus 15 percent. It covers the building and its mechanical and electrical plant. It excludes land, grid works, servers and fees.

Benchmark: Turner & Townsend Data Centre Construction Cost Index 2025, as reported by Data Storage Asia. An estimate is never added to any total on the site.

Colocation price per kW of IT load per month

A powered shell leased to its tenant, which is a different product from colocation, so no per kW price applies.

Project team
ArchitectAWP Architects · 2020 · completed Confirmed source ↗
Architectural design of the Tier III building, 12,000 sqm GFA
Land
Site3 ha · Sep 2018 Confirmed source ↗
Phase 1 plot of a 7ha campus. Seller not named.
Power supply
Grid supplyPLN · 500 MW · Aug 2026 Reported source ↗
Up to 500MW of power capacity secured under a PLN contract, per IndoData. Grid capacity, not IT load. · Applies to the whole campus.

Sources checked 2026-10-21

  1. keppeldatacentres.com
  2. datacenterdynamics.com
  3. dinsights.katadata.co.id
  4. Salim Group buys out Keppel's share of Indonesian data center venture (DCD, 2026-08-27)
  5. Keppel & Salim Group launch data center in Bogor, Indonesia (DatacenterDynamics, 2022-08-03)
  6. Keppel and the Salim Group to jointly develop and operate data centre in Indonesia (Keppel Corporation, 2018-09-10)
  7. INDOKEPPEL DC (AWP Architects, 2026-10-18)
  8. Salim Group buys out IndoKeppel Data Centres, rebrands 500MW DC as IndoData Center (W.Media, 2026-08-26)

More in Greater Jakarta

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.