ArusGridProject
Directory › Indonesia › Greater Jakarta › PDG JC4, GIIC Bekasi

PDG JC4, GIIC Bekasi data center

Cikarang, Bekasi, West Java, Indonesia · Greater Jakarta market · location approximate to district level

Also listed as PDG JC4 project (PT CSCODS, Kabupaten Bekasi).

PDG JC4, GIIC Bekasi is a data center project in Cikarang, Bekasi, Indonesia, operated by Princeton Digital Group. It is under construction. It is planned for 240 MW of IT load.

Latest change on record: entered the record as under construction on 30 April 2026. Record last checked against its sources on 22 October 2026.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
240 MW
Running now
0 MW
Operators rarely publish this
Operator
Princeton Digital Group
Colocation
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Leaning yes4 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted○ Money committed○ Tenant or own use○ Builder appointed✓ Construction started

Next gate to watch: Money committed.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Indonesia approves, powers and taxes data centers is on Data center rules in Indonesia.

Where it sits

Greater Jakarta holds 37 active projects with 3,240 MW of planned IT load between them, and PDG JC4, GIIC Bekasi ranks 4th by planned capacity. Of those, 12 are operational, 10 are operational and expanding, 8 are under construction, 1 is being commissioned, 1 is at the land and permitting stage, 3 are announced only and 2 are on hold. Published colocation vacancy in Greater Jakarta was 24.9% as of December 2025, on 322 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

Princeton Digital Group has 3 others in Indonesia and 5 projects elsewhere in the dataset tracked by ArusGrid, including PDG JC3, GIIC Kota Deltamas, Princeton Digital Group BT1 and PDG JC1 & JC2, MM2100 Cibitung. It sits on the PDG JC4 campus. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The stage was recorded as under construction on 30 April 2026. Power comes from not named (power allocated) through grid supply (reported, unconfirmed).

Grid power for a large industrial user in Indonesia costs about US$0.062 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Indonesia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 2 public sources for this project, and last checked the record on 22 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderNo
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesNo
Dated source in the last 24 monthsNo

AI workloads

StatusLikely

240MW greenfield announced Apr 2026 'to support high-density computing and advanced cooling systems'; PDG CEO cites hyperscale customers and 'cloud and AI workloads'.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

4 buildings x 60MW · Under construction240 MW

Stage history

2026-04-30Under construction · PDG Acquires 240 MW of Powered Land in Jakarta, Advancing Its Rapid Expansion Across Asia (Princeton Digital Group, 2026-04-30)

Who is behind it

OperatorPrinceton Digital Group · Colocation

Who uses the compute

Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

ArusGrid estimate, building costabout US$2.3bn to US$3.4bn

No figure has been announced. This range is 240 MW of planned IT load times a published benchmark of US$11.21 per watt for Jakarta, plus or minus 15 percent, with 10 percent more at the top for liquid cooling because the project is AI-positioned. It covers the building and its mechanical and electrical plant. It excludes land, grid works, servers and fees.

Benchmark: Turner & Townsend Data Centre Construction Cost Index 2025, as reported by Data Storage Asia. An estimate is never added to any total on the site.

Colocation price per kW of IT load per month

No published price band exists for Indonesia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Land
Industrial estateGreenland International Industrial Center (GIIC, Puradelta Lestari / DMAS estate) · 106,217 sqm · Apr 2026 Confirmed source ↗
Powered land, 240MW allocation in release; ~1.7km from JC3. Seller not named.
Industrial estateGreenland International Industrial Center (GIIC) · 106,217 sqm · Apr 2026 Confirmed source ↗
Power supply
Grid supplynot named (power allocated) · 240 MW · Apr 2026 Reported source ↗
Site is 106,217 sqm in GIIC.
Grid supplyPLN (PT Perusahaan Listrik Negara) · Nov 2025 Inferred by ArusGrid source ↗
JC3 also plans renewable energy · JC3 has dual-grid PLN feeds with the full capacity already contracted. JC4 shares JC3's power infrastructure. · Applies to the whole campus.
Why we think so. PDG's 2026-04-30 release says JC4 shares power and connectivity infrastructure with JC3, 1.7km away in GIIC. This article gives JC3's power as dual PLN grid feeds, so the utility for JC4 is inferred.
Possibly linked
The source does not name the project, and more than one project we track fits. We show it on each of them and pin it to none.
UnconfirmedPT Total Bangun Persada Tbk · Main contractor · Sep 2025 source ↗
This project is one of 3 that fit. The others are Digital Edge CGK Campus (CGK1 to CGK4), Cikarang, PDG JC3, GIIC Kota Deltamas.
UnconfirmedPT PLN (Persero) UIP Jawa Bagian Tengah · Grid supply · 60 MVA · May 2025 source ↗
This project is one of 3 that fit. The others are PDG JC3, GIIC Kota Deltamas, Digital Edge CGK Campus (CGK1 to CGK4), Cikarang.

Sources checked 2026-10-22

  1. princetondg.com
  2. datacenterdynamics.com

More in Greater Jakarta

Also run by Princeton Digital Group

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.